Plans and delivers a single project — scope, estimation, scheduling, critical path, tracking, and recovering when it slips. Use this to plan a project, build or challenge a schedule, estimate credibly, track progress meaningfully, or recover a project that is late.

Was ist project-delivery?

project-delivery is a Claude Code agent skill that plans and delivers a single project — scope, estimation, scheduling, critical path, tracking, and recovering when it slips. Use this to plan a project, build or challenge a schedule, estimate credibly, track progress meaningfully, or recover a project that is late.

Funktioniert mit~Claude Code~Codex CLI~Cursor
npx skills add https://github.com/cbrock84/headcount/tree/main/plugins/pmo/skills/project-delivery

In Ihrer bevorzugten KI fragen

Öffnet einen neuen Chat, in dem dieser Agent-Skill bereits geladen ist.

Dokumentation

Project delivery

A project is one bounded piece of work with an end. Coordinating several toward a shared outcome is pmo:program-management.

Scope by exclusion

Inclusions are agreed easily and understood differently. The exclusions do the work: what this project will not deliver, written down and acknowledged by the sponsor.

Unwritten exclusions return as assumptions, always late, always framed as something obviously included. Fixing that at the end is called scope creep; it is usually a documentation failure at the start.

Estimate as a range, and say what the range means

A single-point estimate is a forecast presented as a commitment. Give a range with the assumptions that would move it, and be explicit about confidence.

Estimate the work, not the desired date. Estimates negotiated downward do not change the work; they change when you find out, and the finding-out happens at the least recoverable moment.

Decompose until the pieces are comprehensible. Estimating a large unknown produces a number correlated with optimism rather than with the work.

The critical path is where attention belongs

Not everything late matters. Slippage on the critical path moves the end date; slippage elsewhere consumes float. Knowing which is which is the difference between useful concern and generalised anxiety.

Recalculate as things change — the critical path moves, and a team watching the original one is watching the wrong thing.

Hold buffer at the project level rather than padding each task. Padded tasks absorb their own buffer and deliver no earlier, because work expands and nobody reports finishing early.

Track completion, not effort

Percentage complete is self-reported optimism, and it famously stalls at 90%. Track binary completion of defined deliverables — done or not done, judged against a definition agreed in advance.

Watch the trend: whether the amount remaining is falling at the rate required. A project where remaining work is not decreasing is a project that is late, whatever the reported percentage.

Recovery

Diagnose first, since remedies do not overlap: scope larger than understood, capacity lower than planned, dependencies not delivering, or an estimate that was never realistic.

Then present options with consequences — cut scope and name what, extend and say by how much, or add capacity, which late in a project usually slows things further. Re-baseline once, visibly. Serial one-week slips destroy credibility far faster than a single honest reset.

Change control is what makes the scope statement mean anything

A scope boundary that anyone can move in a conversation is not a boundary. Change control is the mechanism that turns it into one, and it needs to be light enough that people use it rather than route around it.

  • A change is anything that moves scope, date, or cost — including work that arrives described as a clarification. Most scope creep enters as a series of small reasonable requests, none of which was ever assessed against the whole.
  • Assess impact on all three before deciding. "Yes, and it adds two weeks" is a decision someone can make. "Yes" alone is how a plan quietly stops being achievable.
  • The person who can approve a change is the person who owns the consequence. If the sponsor approves scope but the team absorbs the date, changes will keep being approved.
  • Log rejected changes too. The record of what was declined is what stops the same request arriving three more times, and it is the honest answer when someone asks why a feature is missing.

Re-baseline when an approved change makes the old plan meaningless, and not otherwise. A baseline re-set to hide variance destroys the only reference you had.

Tooling

Delivery tracking: Jira, Asana, Linear, Monday.com, Smartsheet, Microsoft Project, and similar.

Portfolio and capacity: Jira Align, Planview, Adaptive Work, and similar. Worth it when you are reconciling many teams' plans against one capacity pool, not before.

The tool records the plan; it does not make the plan true. A status field nobody updates between meetings is worse than no field at all.

Never

  • Agree scope without written exclusions.
  • Present a single-point estimate as a commitment.
  • Report progress as percentage complete.
  • Add people to a late project and expect it to accelerate.

Individual skills in this repo

This repo contains 11 individual skills — each has its own dedicated page.

cbrock84/interface-craft

Raises the visual and interaction quality of an interface — layout, hierarchy, type, spacing, density, and the details that separate a considered product from a generic one. Use this when a screen works but looks unfinished or default, when a layout feels crowded or arbitrary, when a page has no clear focal point, or when an interface needs to feel trustworthy rather than merely functional.

cbrock84/org-design

Designs how an organization is structured — reporting lines, team boundaries, spans and layers, role definition, and workforce planning against the strategy. Use this to structure a new team, restructure an existing one, resolve unclear ownership between teams, plan headcount, or diagnose why a team underperforms for structural rather than individual reasons.

cbrock84/portfolio-governance

Governs the portfolio of work — intake, prioritization, stage gates, resource contention, and stopping things. Use this to set up intake and prioritization, run a stage gate, decide between competing initiatives, resolve resource contention across projects, or work out why everything is in flight and nothing is finishing.

cbrock84/product-launch

Takes something built and gets it into the market — tiering the launch to match what it actually warrants, sequencing internal readiness before external announcement, preparing sales and support to answer the questions it creates, choosing the date for a reason, and measuring adoption rather than announcement reach. Use this to plan a launch, right-size one that is consuming more than it deserves, work out why a released feature nobody uses was launched loudly, or run the weeks after launch day.

cbrock84/program-management

Plans and drives cross-functional programs to delivery — scope, sequencing, dependencies, status, risk, and the escalations that keep work moving. Use this to run a multi-team initiative, recover a program that is slipping, build a delivery plan with dependencies, structure status reporting, or diagnose why cross-team work keeps missing dates.

cbrock84/retention

Diagnoses and reduces churn — cancellation flows, save offers, failed-payment recovery, at-risk detection, and the product and service causes underneath. Use this when churn is rising or unexplained, to design a cancellation or win-back flow, to recover involuntary churn, to identify at-risk accounts before they leave, or to decide whether a retention problem is a product problem.

cbrock84/sales-enablement

Builds what a sales team needs to sell — pitch decks, one-pagers, objection handling, competitive battlecards, demo scripts, and case studies. Use this to create or fix sales collateral, prepare for a competitive deal, build a demo flow, document objection responses, or diagnose why a pitch is not converting.

cbrock84/tax

Structures the tax questions a growing business faces — corporate income, sales and use, payroll, nexus, and the obligations created by hiring or selling somewhere new. Use this to work out what a new state or country obligates you to, prepare for a tax filing or audit, understand sales tax on your product, or check what a remote hire or new market triggers.

cbrock84/unit-economics

Establishes whether the business makes money on each customer or unit — contribution margin, acquisition cost, payback period, lifetime value, and the cohort behavior underneath. Use this to assess whether growth is profitable, evaluate a channel or segment, support a pricing decision, judge how fast the business can afford to grow, or diagnose why revenue growth is not producing profit.

cbrock84/video-content

Plans and scripts short-form and long-form video, and designs the packaging — titles, thumbnails, and openings — that determines whether it gets watched. Use this to script a video, plan a series, fix retention or click-through problems, design thumbnail and title concepts, or turn written content into video. For a YouTube channel specifically — idea selection, retention teardowns, and channel-level strategy — use `youtube-producer`.

cbrock84/visual-content

Designs and directs the visual assets that carry content — carousels, infographics, quote graphics, diagrams, and social imagery — including the generation prompts where they are AI-produced. Use this to turn a written piece into a visual format, design a carousel or infographic, create social graphics, or fix visuals that are not stopping the scroll.

Verwandte Skills