Feasibility Study Consultant

A structured framework for project feasibility analysis and research report writing — for any business decision scenario: "Can we do this, how, and is it worth it?" Includes 10 evaluation modules, mandatory real-time due diligence, multi-source cross-validation, reader-centric writing, and structured report output.

What is Feasibility Study Consultant?

This skill serves as an intelligent coach for conducting rigorous feasibility studies, transforming gut feelings into methodical, evidence-based, and verifiable conclusions. It guides users through a six-step coaching process: eliciting project details, selecting the right methodology based on problem and project type, building an assumption ledger, executing due diligence, validating key hypotheses, and arriving at a clear Go/Conditional Go/No-Go decision. The skill enforces critical principles like conclusion-first writing, data-driven analysis with source grading, mandatory real-time web research, and explicit decision gate criteria. It supports multiple project types (capacity, service, tech, asset, platform, trade) and provides zero-dependency Python scripts for assumption management and feasibility scoring, along with templates for project cards and decision gates.

Works with~Claude Code~Codex CLI~Cursor
npx skills add https://github.com/lingyu9495-source/agent-skills/tree/main/skills/feasibility-study-consultant

Installed? Explore more Research & Data Analysis skills: affaan-m/uspto-database, affaan-m/scholar-evaluation, affaan-m/literature-review · View all 6 →

Ask in your favorite AI

Open a new chat with this agent skill pre-loaded.

Documentation

Project Feasibility Coach (Feasibility Study Consultant)

One-liner: Turn "Can we do this, is it worth it, and how to succeed" from a gut feeling into a methodical, evidence-based, threshold-driven, and reviewable conclusion. Complete skill pipeline: ① How to elicit project details (guided collection) → ② Choose methodology by problem and project type (method selection) → ③ Validate key assumptions one by one (assumption ledger) → ④ Conclude against thresholds (decision gates). v1.4 Upgrade: Added the "Six-Step Coaching Process", a project-type question library (templates/引导提问清单.md), a methodology selection library (references/方法论库.md), a decision gate checklist (templates/决策门清单.md), and two zero-dependency scripts — feasibility_scorecard.py (threshold scoring with Go/Conditional Go/No-Go) and assumption_ledger.py (assumption prioritization and validation planning).

Triggers

Activate when the user needs any of the following:

  • "Write a feasibility study / feasibility plan / feasibility report for XX"
  • "Assess whether XX can be done / is worth doing"
  • "Research the XX direction and produce an analysis"
  • "New project / new product / new business case justification"
  • "I have several options; help me choose one"
  • "Is now the right time to do this?"

Core Principles

  1. Conclusion First — Start with an overall judgment (star rating/score/go or no-go), not background context.
  2. Data Driven — Every dimension must be supported by the latest market data, with source grades annotated (A Official / B Industry / C Media / D Inference).
  3. Cross-Validation — Core data requires at least 2 independent sources; discrepancies must be explained, not hidden.
  4. Research Before Writing (Mandatory) — Always conduct real-time web due diligence before drawing any conclusion; never write market data from model memory.
  5. Align Perspective — Clarify before writing: Who is the reader (investor/management/bank/government)? What do they care about most (market size/barriers/profitability/risk)? Write from the reader's perspective.
  6. Source Transparency — Mark key data points with their source; include a data source table and a key assumptions list at the end.
  7. Set the Threshold First (v1.4 New) — Define "what constitutes a pass" before starting (e.g., minimum IRR, maximum payback period, positive unit economics, all fatal assumptions verified); otherwise, the analysis becomes "finding materials to support a pre-existing conclusion."
  8. Assumption Traceability (v1.4 New) — Every key assumption underlying the conclusion enters a ledger, with its validation method and pass/fail criteria stated; making a conclusion with unverified high-impact assumptions equals gambling.

Coach's Six-Step Process (Overview)

StepWhat to DoOutputCompletion Criteria
1. Guided CollectionUse a one-page project card + three rounds of questions to elicit project detailsCompleted "Project Card"All 5 mandatory questions answered; gaps and red lines identified
2. Type & Depth DiagnosisDetermine problem type × project type × stage × readerOne-line diagnosis + analysis depthClear on "what question to answer, for whom, and how in-depth"
3. Method SelectionPick 3–5 method combinations from the methodology libraryMethod list + data requirements for eachEvery method can state "what data it needs and what conclusion it produces"
4. Execute AnalysisDue diligence & data collection → six actions (Market/Competition/Unit Economics/Financials/Risk/Compliance) → DraftAnalysis draftEvery statement has a source; four tables (Investment/Cost/Income/Indicators) are consistent
5. Assumption ValidationBuild assumption ledger, rank by impact × uncertainty, design validationAssumption ledger + validation plan + blocking items listAll high-impact assumptions are either validated or falsified
6. Conclusion & Decision GateJudge against threshold table, output one of three conclusions + next stepsConclusion page + decision gate checklistConclusion maps to each threshold item; no "skipped judgment"

The six steps are not a rigid assembly line but a decision sequence: if a red line is found in step 1, the remaining five steps are unnecessary.

Step 1 · Guided Collection: How to Elicit Project Details

If the client can't articulate the requirement, it's not that they're uncooperative; it's that they don't know what you need. So use structured guidance, not open-ended questions.

Method: One-Page Project Card + Three Rounds of Questions (Templates: templates/项目卡.md, templates/引导提问清单.md)

  • Round 1 · Qualitative 5 Questions (no research needed, 5 minutes): What is it? Where does the money come from? Who will see it? When is it needed? What is the single most important question to answer?
  • Round 2 · Project Type Follow-ups (choose the corresponding set of 5 questions from 6 project types): Capacity / Service / Tech / Asset / Platform / Trade
  • Round 3 · Validation Resources (determines conclusion rigor): What primary materials can you access? Who can you interview? Can you pilot it? Are there hard constraints? If the conclusion is "not viable," what would you do?

Gap Handling Rules (Don't stop for lack of data, but don't pretend it's not missing)

GapHandling
Missing investment estimateEstimate using industry benchmarks / similar project intensity, explicitly mark "Pending confirmation"
Missing market dataBottom-up estimation + authoritative secondary data, mark evidence level
Missing customer orders / proof of paymentIrreplaceable: Classify as fatal assumption, use "Conditionally Feasible" language
Missing policy basisSearch first; if no clear basis, state "No explicit prohibition found; recommend confirmation with regulatory authorities"

Ask About Red Lines First: Illegal funding source, regulatory compliance breach, inability to obtain core elements, customer unwilling to pay, negative unit economics — any one of these leads to "Not Feasible" or "Change Scope" (see Project Card Section D).

Step 2 · Type & Depth Diagnosis (Four Dimensions, Clear in One Go)

DimensionValuesWhat It Affects
Problem TypeCan it be done? / Is it worth doing? / Which option is better? / How to make it happen?Determines which methods to use (see Step 3)
Project TypeCapacity / Service / Tech / Asset / Platform / TradeDetermines analysis focus (capacity: factors & production; platform: network effects & unit economics…)
Research StageOpportunity Study (coarse screening) / Pre-feasibility (decide if deeper analysis is warranted) / Detailed Feasibility (decision basis) / Approval or Loan Review (compliance + financials)Determines precision and effort (don't use detailed feasibility costs to answer an opportunity study question)
ReaderCompany head for budget approval / Bank for loan review / Government for project approval / Investor for funding / Self for peace of mindDetermines "what counts as a pass" and report wording

Output: One-line diagnosis — "This is a pre-feasibility study for a service-type project, answering 'Is it worth doing?' The reader is the bank for loan review, and the thresholds are Debt Service Coverage Ratio ≥ 1.3, IRR ≥ 8%."

Step 3 · Method Selection (First Determine Problem Type, Then Choose Methods)

Question to AnswerPreferred Method CombinationKey Data Requirements
Can it be done (Feasibility)Stage-Gate Six Criteria + Policy & Compliance Check + Technology/Resource Availability + Pre-mortemPolicy texts, permits & resource evidence, similar failure cases
Is it worth doing (Economics)Unit Economics Model + Financial Evaluation (3-scenario IRR/NPV/Payback/Break-even) + Sensitivity Critical Point + Bottom-up Market SizingUnit price & cost structure, investment composition, financing conditions, market sizing worksheet
Which option is better (Comparison)Weighted Decision Matrix (or AHP approach) + Financial comparison per option + Conclusion robustness checkQuantifiable indicators per option; criteria weights and justification
How to make it happen (Path)Stage-gate phased approach + Assumption ledger + Small-step validation (pilot/MVP)Key assumptions list, affordable trial budget and time window

Method Library (Full version in references/方法论库.md, includes "When to use/How to use/What data needed/Common misuse")

  1. Stage-Gate Decision (Go / Kill / Hold / Recycle + Six Criteria)
  2. Bottom-Up Market Sizing (TAM / SAM / SOM)
  3. Competitive Moat Analysis (7 Powers Structural Advantage Check)
  4. Unit Economics Model (Unit Margin, Payback Period, LTV/CAC)
  5. Financial Evaluation (IRR / NPV / Payback / Break-even / Sensitivity Critical Point)
  6. Multi-Option Comparison (Weighted Decision Matrix / AHP Approach)
  7. Pre-Mortem (Assume failure and trace back causes + early warning signals)
  8. Assumption Ledger & Minimum Cost Validation
  9. Dual-Perspective Cross (Policy View × Capital View)
  10. Evidence Grading & Multi-Source Cross (A/B/C/D)

Selection Rule: 3–5 methods are enough for one pass; piling on methods ≠ rigor. Each method must be able to answer "what data does it need, what conclusion does it produce, and what if the conclusion is unsupported."

Step 4 · Execute Analysis: Six Mandatory Actions

4.1 Research First, Then Write (Order Enforced)

① Search & Due Diligence → ② Organize Data → ③ Cross-Validate → ④ Write. Never write first, then fill in data. Due diligence scope (parallel multi-track):

  1. Industry Landscape: Scale, growth rate, lifecycle → Industry reports, brokerage research
  2. Market: Target customer, demand intensity, willingness to pay → Competitors, user discussions, bid prices
  3. Competition: Direct/indirect competitors, landscape, barriers → Top players
  4. Policy: Industry policy, regulation, access, subsidies → Original government documents
  5. Financials: Input-output benchmarks → Investment/return data of similar projects
  6. Risk: Known failure cases, regulatory red lines → Search for negatives (This step is most often skipped, yet most valuable)

Escalate data collection based on page difficulty: Normal scraping → Anti-scraping bypass → Browser automation. Save raw materials for traceability; no need to re-search when revising.

4.2 Six Actions Checklist (Tailor to Project, Don't Force Fit)

#ActionCore Question to AnswerCriterion
1Market & DemandHow big is the market? Growth rate? Target audience? Why will we win?Bottom-up estimation + ≥2 sources cross-verified
2Competition & BarriersWho are the competitors? What is our structural advantage?At least one advantage that's not "work harder / be cheaper"; or honestly state "no barrier"
3Unit EconomicsIs each transaction profitable? How long to recoup customer acquisition cost?Positive unit margin; payback period ≤ threshold value
4Financial EvaluationHow much to invest? When to break even? IRR/NPV?Three scenarios complete; critical points identified
5RiskTop 3 risks + trigger signals + countermeasuresEach risk has early warning indicators and an owner, not clichés
6Compliance & ResourcesPolicy, permits, land, energy, qualificationsStatus and estimated timeline for each item

4.3 Dual-Perspective Cross (Policy × Capital)

  • Policy Perspective: Industry policy direction, access & approvals, regulatory trends, subsidies & compliance costs → Determines "Is now the right time?"
  • Capital Perspective: Capital availability & cost, return thresholds, exit paths, comparable transaction valuation anchors → Determines "Is it worthwhile?"
  • Cross Judgment: Policy support × insufficient capital = Small-step trial; Profitable capital × tightening policy = Cautious with exit plan; Both unsupportive = Don't do it.

Step 5 · Assumption Validation (The Most Valuable Step of This Skill)

The essence of project analysis is to list key assumptions, then validate them one by one.

5.1 List Assumptions, Then Prioritize

Write down all assumptions the conclusion depends on, and rank them by Impact (1-5) × Uncertainty (1-5) :

  • High impact + High uncertainty → Validate first (This is "validate the most critical ones first, not the easiest ones")
  • High impact + Low uncertainty → Low risk but must be traceable (if invalid, it's a game-changer)
  • Low impact → Can be validated later

5.2 Each Assumption Must Have a "Pass/Fail Threshold"

Poor WordingGood Wording
Customer is interestedSigned letters of intent from 3 regional top-tier customers (locking in 60% capacity)
Costs are controllableLand acquisition cost ≤ 450,000 yuan/mu
Policy supportIncluded in provincial special plan / Obtained written confirmation from regulatory authorities
Technology feasibleCompleted pilot run, stable operation for 30 consecutive days

If the threshold is not strict, validation becomes "finding evidence to prove oneself right."

5.3 Manage the Ledger with Scripts (Zero Dependencies)

# Assumption Ledger: Prioritization + Blockers + Validation Plan (shows what to validate first)
python3 scripts/assumption_ledger.py assumption_ledger.csv --plan
python3 scripts/assumption_ledger.py assumption_ledger.csv --json

# Feasibility Scorecard: Weighted score + Threshold judgment + Fatal assumptions + Go/Conditional Go/No-Go
python3 scripts/feasibility_scorecard.py project_evaluation.json
python3 scripts/feasibility_scorecard.py --print-schema   # See input structure
python3 scripts/feasibility_scorecard.py --demo           # See what output looks like
  • Ledger CSV columns: Assumption, Category, Impact, Uncertainty, Validation Method, Evidence Level, Status, Owner, Deadline (Template: templates/assumption_ledger.csv)
  • Status values: unverified / in_progress / verified / falsified
  • Non-zero exit code = high-impact assumptions remain unverified, allowing integration into automation: no conclusion without passing.

5.4 Validation Methods Cost-Optimized (Don't Throw Money at It First)

Get primary data (policies, transaction announcements, tender prices) → Interview (customers, suppliers, industry peers) → Obtain pre-commitments (LOIs, credit letters, quotes) → Pilot/MVP (minimum viable scope) → Full commitment.

Step 6 · Conclusion & Decision Gate

Three Conclusion Formats (Don't just write "Feasible/Infeasible")

  1. Go (Do it): All thresholds passed → Provide investment pace and next steps.
  2. Conditional Go (Do it if): Primary thresholds met, blocking items exist → List "complete these X items to proceed" + validation plan and timeline.
  3. No-Go (Don't do it): Falsified fatal assumption / Financial non-compliance / Red line crossed → Specify whether it's "direction is wrong" (Kill) or "conditions not met" (Hold).

Four Decision Gate Outputs (Source referenced at end): Go (Pass) / Kill (Terminate, document reasons) / Hold (Pause, specify signal to restart) / Recycle (Direction okay but insufficient material, send back for rework).

Practical Tip: For most "unclear" projects, the correct answer is Hold or Recycle, not a forced Go.

Conclusion Page Must Include: Overall judgment + Score table per dimension + Blocking items & fatal assumption status + Evidence level explanation + What to validate next (who, when, criterion).

Supporting File: templates/decision_gate_checklist.md (Six criteria + Threshold table + Four decisions)

Ten Evaluation Modules (Cut to Fit When Writing Reports)

#ModuleCore Question to Answer
1Executive SummaryOne-line conclusion + 3-5 core judgments (Write last)
2Project OverviewWhat? Goal? Scope?
3Background & NecessityWhy now? What if we don't?
4Market AnalysisHow big? Growth rate? Target audience? Why will we win?
5Competition & BarriersWho are the competitors? Our moat?
6Product/Service & OperationsHow will we deliver? Is the team sufficient?
7Business ModelHow will we make money? Revenue structure? Margin?
8Financial ProjectionsHow much to invest? When to break even? IRR/NPV?
9Risk & CountermeasuresTop 3 risks + specific countermeasures + early warning signals
10Conclusion & RecommendationsGo/No-Go/How + Next Steps

Writing Requirements

  1. Write the Executive Summary last (you need conclusions first to write it accurately).
  2. Every number must have a source or be marked "Assumption, pending validation."
  3. Financial section: Provide calculation logic + key assumptions; do not fabricate numbers down to the cent.
  4. Risk chapter: Write specific triggers + impact + countermeasures; no clichés.
  5. Explicitly mark areas of uncertainty as "Pending validation / Pending completion" — acknowledging boundaries is professionalism, not a flaw.
  6. Assumption ledger and conclusion page must be consistent with the main text (same number must have the same value in the summary, body, appendix, and conclusion page).
  7. Delivery format per user request (Word/Markdown/PPT/online document), properly formatted, no "AI-like" feel.

Suggested Output Structure

  • Cover Page (Title / Version / Date / Classification)
  • Executive Summary (1 page): Overall judgment + Threshold table + Key assumption status + Next steps
  • Body (Chapters trimmed from the ten modules)
  • Appendix: Data Source Table (with evidence level), Key Assumptions Ledger, Pending Validation Checklist (who / when / criterion)

Quality Self-Checklist (Before Delivery)

  • Are there any market numbers written without searching?
  • Do core data points have ≥2 independent sources? Is the evidence level marked?
  • Was the "what counts as a pass" threshold written down before starting, and does the conclusion map to each item?
  • Do conclusion and evidence match? Is there any over-interpretation (e.g., correlation as causation, local as global)?
  • Are opposing views / failure risks missing? Was a pre-mortem done?
  • Do all key assumptions have a status (verified/unverified/falsified)? Are unverified high-impact assumptions explicitly listed as blocking items?
  • Financials: Are the three scenarios complete? Are the four tables (Investment/Cost/Income/Indicators) consistent?
  • Reader perspective: Can they make a decision after reading it?
  • Has any "client's assumption" been written into the main text as "verified fact"?

Common Misuses & Traps

TrapConsequenceCorrection
Conclusion first, then find evidenceAnalysis becomes advocacyThreshold and assumption list are set before the analysis
Using the industry report's ceiling as your marketSeverely overestimated sizeBottom-up estimation + differentiate TAM/SAM/SOM
Treating "work harder / be cheaper / good service" as a barrierProject quickly commoditizedUse structural advantages (scale, network effects, switching costs)

Individual skills in this repo

This repo contains 17 individual skills — each has its own dedicated page.

lingyu9495-source/agent-responsiveness-delegation

你给 AI 助手派了个重活,然后发现:发消息它不回、想插话只能排队、等十几分钟才回一句——等它抬头,需求早变了。根因不是模型慢,是主脑把重活放在前台跑,整个回合被占死。这个 Skill 把这套「重活外派 + 随时应答」机制做成可落地的东西:① 规则块(一页写清判级、派完立刻让出对话、工单四要素、只回收结论、自报≠事实、拍板留主脑、跨会话任务换机制)② 跨平台落地脚本 provision_agent_responsiveness.py:探测本机已有的 Agent 环境(Hermes 的 SOUL 置顶铁律块、Claude Code 的全局指令文件,这两条已实测),把规则块幂等写入(自动备份原文件、重复执行不重复写、绝不覆盖你已有内容);其余平台(Codex / Cursor / WorkBuddy / 任意 Agent)则导出一份可直接粘贴的规则块 markdown,你粘到系统提示或自定义指令里就生效 ③ 体检脚本 audit_agent_responsiveness.py:逐项核对规则块是否存在、是否被后续改动覆盖、探测到哪些平台——没检测到就如实报「未检测到支持的平台」,不假报通过。纯标准库、零依赖、Windows/macOS/Linux 通用。触发词:AI不回话、等太久、插话卡住、助手响应慢、主脑被占住、重活外派、子代理、多智能体、响应速度、落地配置、系统提示。

lingyu9495-source/ai-image-watermark-removal-boss

去除 AI 生成图角落的"XXAI生成"半透明/白色角标水印。像素级验证不自我欺骗、双信号交叉定位抗幻觉、多候选客观指标投票覆盖。当用户要求去除图片水印、清理 AI 生成角标、去"豆包/即梦/Kolors 生成"水印时使用。

lingyu9495-source/bank-scan-household-splitter

客户丢来一个压缩包,里面几百张身份证正反面、开卡申请书、合同——**人工一张张挑,一下午就没了,还容易漏**。

lingyu9495-source/cn-pdf-report-typeset

中文报告做成 PDF,常见翻车三件套:**字体乱码、表格错位、字号小到客户在手机上根本看不清**。这套是交付级的排版标准加可直接跑的模板。

lingyu9495-source/company-law

公司出事,十有八九出在**治理和控制权**上——股权结构一开始搭歪,后面融资、上市、分家全是坑。

lingyu9495-source/excel-keep-format-edit

客户拿来一张老报表说「就在原表上改个数,格式一点都不要动」——用 openpyxl 重建一次,字体、边框、合并单元格、条件格式、列宽全丢,客户一打开就知道这不是他原来那张表。

lingyu9495-source/feasibility-report-engine

做可研报告,卡住的往往不是不会写,是**不知道按哪版大纲、财务测算六表和正文对不上、交付前排版被退稿**。这套是从二十多万字、131 张表的真实交付里固化的流水线。

lingyu9495-source/financial-statement-adjustment

存量财务报表在原表基础上改数字并保持三表勾稽关系。当用户要求「在原报表上改某些数字,其他数据跟着调整且格式完全不变」时使用:资产负债表/利润表/现金流量表的目标值调整、未分配利润与利润总额联动、勾稽校验。

lingyu9495-source/funding-fit-diagnosis

项目想融资,卡住的往往不是不会写 BP,而是不知道够不够格、该找谁、还缺什么、多久能到钱——问 AI 只得到"建议加强团队"这类正确的废话。这套引擎把它拆成可执行的四步:①10 问项目画像采集(缺关键项就先追问,不猜)②双轨评分:市场化 VC 适配分与政府基金适配分**分开算、各自判定**(≥75 强匹配 / 60-74 可争取 / 45-59 需补短板 / <45 暂不建议,低分不许只说"不行",要给替代路径)③点名机构:按赛道/阶段/地域从 23 家头部 VC 与产业资本(CVC)、21 家政府基金的卡片里逐条对照"匹配信号/劝退信号",每家写清"为什么是你、你还缺什么、材料怎么准备、递送路径",并单列"不建议碰"的机构省时间④差距清单(差距|补齐动作|耗时|难度|优先级,只挑 3 个月内能推动的)+ 三线找钱路线图(市场化 / 政府 / 替代路径)+ 时间预期与现金流提醒。包内另附 30 个真实融资案例对标、TS 条款红线、估值倍数参考、BP 制作铁律,以及零依赖离线评分脚本(纯标准库、不联网、不调大模型 API)。输入:项目情况(照着 10 问答即可);输出:一份研判报告(评分 + 优先接触名单 + 差距清单 + 路线图 + 风险提示),脚本侧可另出 JSON 评分结果。评分是适配度不是成功率,不承诺融资结果。触发词:融资、找投资、融资研判、能不能融到钱、找哪家风投、风险投资、VC、产业资本、CVC、政府引导基金、政府基金申报、产业基金、招商返投、项目申报、补贴申报、商业计划书、BP、路演、估值、股权稀释、TS 条款、对赌、回购、FA、财务顾问、找钱、融资渠道、天使轮、Pre-A、A轮。

lingyu9495-source/gov-fund-application

想拿政府的钱,最容易白跑半年——层级选错、赛道不在目录里、返投算不清,材料递上去才发现方向不对。这套参谋按可执行顺序走:①先判层级(国家级/省级/市级/区级,门槛与目的完全不同)②赛道对目录:不在目录里直接如实说没戏,不让用户白跑③21 家基金卡片逐家对照(投资方式、返投比例、让利规则、申报条件、申报通道、真实案例),点名"你这个项目适合找谁"④返投博弈:算清落地要求,给"不想迁注册地"的三条合规路径⑤材料与时间表:申报材料清单、评审周期(6-12 个月是常态)与现金流提醒。与主技能 `funding-fit-diagnosis` 配套(做整体融资研判时用主技能,VC 与政府双轨分开算)。输入:项目基本情况与注册地/落地意愿;输出:层级判定 + 可申报基金名单 + 返投方案 + 材料清单 + 时间预期。不承诺拿到资金,申报须如实提交材料;政策口径标注截止时间,细则请向当地主管部门核实。触发词:政府基金、政府引导基金、产业基金、政府补贴、专项资金、项目申报、补贴申报、申报条件、返投、招商落地、母基金、投资方式、让利、国家级基金、省级引导基金、市级基金、科技成果转化、专精特新、科技型企业、中小企业发展基金。

lingyu9495-source/hermes-profile-browser-isolation

多个 AI 助手同时干活时,浏览器会互相抢占:弹窗抢焦点、任务互相打断、你正在用的 Chrome/Edge 被顶掉——**你连自己的网页都点不动了**。

lingyu9495-source/investment-finance

做投融资最容易踩的坑不是"不懂概念",是**条款里的每一个字都在分钱**——估值方法选错、对赌触发条件写松、回购条款没兜底,签完才发现少拿几千万。

lingyu9495-source/lowvram-ai-video-comfyui

网上的 AI 视频教程开口就是 24G 显存,一看就把人劝退——**其实 8G 的 4060 也能跑**。这套是 RTX 4060 Laptop 8G 显存 / 32G 内存 / Win11 上真跑出来的配置与调参。

lingyu9495-source/novel-deai-detector

写完的稿子发布前想知道会不会被判 AI 生成、平台审核会不会卡、读者会不会一眼看出机器味——这套是检测到清洗的完整闭环。

lingyu9495-source/npl

不良资产这行的钱,赚在**买入价**上——买贵了,后面怎么处置都白搭。

lingyu9495-source/subagent-first

AI 助手不是不够聪明,是被重活占住了:你让它整理 40 个文件,它一头扎进去十几分钟不抬头——你想问进度、想补需求、想改方向,只能干等。这套作业纪律解决的就是这件事:凡是预计要跑多轮的活(多文件/长研究/批量/长搜索),一律派给后台子代理并行执行,主代理只保留四个动作——拆解、派活、汇总、对话,永远保留随时回你话的能力。我们自己在多智能体团队里天天跑,踩过的 12 个坑全部写进正文:子代理自报成功却发现产出是空的、context 没写全导致跑偏返工、两个子代理并行写同一文件互相覆盖、把需要用户拍板的活派给问不了人的子代理、跨会话长任务错用子代理导致某天悄悄停掉……① 决策树四问判定轻重(一轮工具调用能做完吗/需要用户拍板吗/要活过本次会话吗/能拆成互不依赖的块吗)② 派活四要素(goal / context 必须自包含——子代理看不到你和用户的对话 / output_schema / 验收方式)③ 五步流程:拆解→派活→并行调度→验收→收口 ④ 验收清单:存在性/合规性/真实性/完整性四组逐项打勾,并随机抽一处回一手来源核对 ⑤ 6 种委派模式 + 12 条反模式。配套 scripts/delegation_planner.py:纯标准库零依赖,喂一份任务清单(轮数/文件数/是否研究/是否批量/是否需拍板/是否不可逆/是否跨会话),直接输出「该派子代理 / 自己做 / 转定时任务」+ 并行分组建议 + 主代理必做清单。正文按平台无关的作业纪律写,并附常见平台工具名对照表;Hermes 的字段名/并发上限/后台语义另附一页实况对齐,其他平台按对照表映射即可。触发词:子代理、委派、delegate、任务编排、多智能体、并行执行、上下文管理、主代理被占住、AI不回话、等太久、插话卡住、批量处理、长研究、fork-join、fan-out。

lingyu9495-source/ts-term-review

拿到 TS 或投资协议,看半天不知道哪条能签哪条得改——风险全藏在具体条目里,一句"整体没大问题"最要命。这套审查按 15 条核心条款逐条过:估值 Pre/Post、清算优先权、反稀释(完全棘轮是红线)、优先购买权、领售/拖售、对赌与业绩承诺、回购条款、个人连带担保、董事会与一票否决、保护性条款、竞业与知识产权、信息权、交割条件、股东会表决权、违约责任。每条给三级判定(🔴 红线不改就别签 / 🟡 可谈争取改 / 🟢 行业惯例)+ 谈判话术 + 替代方案,并区分"对公司"和"对创始人个人"——个人连带回购是绝大多数血案的源头,重点标红。另附谈判筹码排序、常见坑清单、BP 与数据室准备。与主技能 `funding-fit-diagnosis` 配套(做整体融资研判时用主技能)。输入:TS/投资协议条款(粘贴或描述);输出:逐条判定表 + 必须改的清单 + 谈判话术 + 底线建议。**不构成法律意见**,正式签署与司法效力请找执业律师确认。触发词:TS、Term Sheet、投资条款清单、投资协议、增资协议、股权转让协议、对赌、业绩承诺、回购、清算优先权、反稀释、完全棘轮、个人连带、一票否决、领售权、拖售权、估值、Pre/Post、股权稀释、条款谈判、FA。

Related Skills