Note: The primary anchor industry for this skill is now ai-video (video content creation); the hotel examples in the text are historical reference cases.
HyperReality Industry Landing Complete Solution Design Methodology
I. Skill Positioning
1.1 What Problem Does This Skill Solve
After HyperReality has completed industry competitor research (Skill 1) and frontline operations research (Skill 2), the final question to answer is: Based on these research conclusions, combined with HyperReality's own product design philosophy and technical architecture, how to design a complete, R&D-team-deliverable industry landing plan?
This skill is the "meta-methodology" that answers this question. It is not a simple concatenation of the conclusions from Skills 1 and 2, but rather uses HyperReality's product philosophy as the skeleton and competitor and frontline research as the flesh and blood to design a complete industry landing plan—from the industry abstract model, to the new business SOP, to the Skills development list, to the system integration architecture, to the landing roadmap, to value increment estimation, covering everything without omission.
Core Philosophy: HyperReality's industry landing is not about "adding a few AI functions to the industry," but about "rewiring the nervous system of industry operations with Agent IM." This skill is the design methodology that turns this statement into an executable plan.
1.2 When to Invoke
- After Skill 1 (Competitor Research) and Skill 2 (Frontline Operations Research) are both completed
- When HyperReality decides to formally enter a new industry and needs to output a plan deliverable to the R&D team
- When an existing industry Bundle requires a major upgrade (e.g., from MVP to full coverage)
- When an industry landing plan needs to be presented to investors/partners
1.3 Intended Users
- Industry Delivery Engineer (responsible for Industry Bundle development)
- Product Architect (responsible for architectural integration between HyperReality Base and Industry Bundle)
- R&D Team (responsible for Skills development and system integration)
- Business Team (responsible for landing roadmap and value estimation)
1.4 Relationship with Other Skills
This skill is the third step (and the final step) for HyperReality's industry entry. Skill 1 and Skill 2 run in parallel and independently. Their outputs, together with the HyperReality Base, form the input for this skill:
Skill 1 (Competitor Research)──┐
├──→ Skill 3 (Landing Complete Solution Design)──→ Deliverable to R&D team
Skill 2 (Frontline Research)───┘ ↑
│
HyperReality Base (Code as primary source of truth + PRD as fallback)
-
Input ← Skill 1 (Competitor Research): differentiated competitive points, industry trend judgment, insights for HyperReality
-
Input ← Skill 2 (Frontline Operations Research): AI substitution feasibility matrix, workflow decomposition, industry know-how, pain points and churn points
-
Input ← HyperReality Code (primary source of truth, dynamic inventory): Base Bundle nine-domain capabilities, Industry Bundle assembly mechanism (six assembly slots), Agent preset configuration, Skill standard format, Five-Element Event schema freeze scope—every capability reference in the plan must have a code path anchor
-
Input ← HyperReality PRD (fallback/background reference): used when code is unavailable or design intent understanding is needed; when PRD conflicts with code, code prevails and the difference should be noted
-
Output → R&D Team: Skills development list, system integration architecture, landing roadmap
-
Output → Business Team: value increment estimation, pricing model, success metrics
-
Output → Industry Bundle: industry abstract model, SOP design, fence rules, one-store-one-file Schema
II. Applicable Scenarios
2.1 Typical Scenarios
Scenario 1: New Industry Complete Landing Plan Design After HyperReality completes competitor and frontline research for the restaurant industry, a complete landing plan for the restaurant Industry Bundle needs to be designed—from abstract model to SOP to Skills to architecture to roadmap to value estimation.
Scenario 2: Full Upgrade of an Existing Industry Bundle The hotel Industry Bundle needs to be upgraded from MVP to full coverage, requiring a complete redesign (e.g., expanding from 3 Skills to 13 Skills).
Scenario 3: Cross-Industry Abstract Adaptation After the hotel industry is running, the hotel experience needs to be abstractly adapted to the restaurant/beauty/education industries, designing landing plans for these new industries.
2.2 Non-Applicable Scenarios
- Invoking before completing Skill 1 and Skill 2 (this skill depends on the outputs of the previous two skills)
- Single Skill design (use Skill development methodology, no need for a complete landing plan)
- Pure technical architecture design (this skill is an industry landing plan, not a technical architecture document)
III. Methodology: Six-Module Complete Solution Design
3.1 Core Principles
Principle 1: Full Restructuring, Not Point Solutions. HyperReality's industry landing is not about "adding a few AI functions to the industry," but about "fundamentally restructuring the underlying business processes of all industry operations." The plan must cover all business operations of the industry, not just a few points.
Principle 2: HyperReality Product Philosophy as the Skeleton. The core architecture of the plan must be based on HyperReality's product philosophy—Five-Element Event Model, Fence Engine, Night Shift Crew, Five-Level Execution Layering, Three-State Collaboration, Skills Marketplace. It cannot deviate from the HyperReality Base and create its own system.
Principle 3: High-Level and Deeply Detailed. The plan must have both strategic height (a universal abstract model, the vision of changing the industry) and execution details (67 SOP steps, 13 Skill specifications, five-level layering integration strategy).
Principle 4: Deliverable to the R&D Team. The plan must be executable—Skills have detailed specifications, the architecture has an integration strategy, the roadmap has clear phase dependencies and task lists, and value has estimation basis. It cannot be a vague "strategic document."
Principle 5: Abstract Adaptation. While deeply focusing on the target industry, each module must explain "how to abstractly adapt to other service industries," paving the way for HyperReality's cross-industry expansion.
3.2 Six-Module Design Framework
Module 1: Industry Abstract Model
Design Goal: Abstract the target industry's operational processes into a reusable service industry model, ensuring the model can both guide the landing in this industry and be quickly adapted to other service industries.
Design Steps:
- Core Judgment: See through the essence of this industry's operations (e.g., the essence of hotel operations is "event-driven continuous decision flow")
- Five-Element Event Modeling: Fully map the industry's operations to HyperReality's Five-Element Event model (Who×Context×Object×Decision×RuleImpact). Identify the industry's core operational objects (e.g., 16 types of operational objects for hotels), extend objects.json.
- Operational Stage Lifecycle: Define a three-level stage model—store-level stages (e.g., climbing/stable/peak/low/adjustment), customer-level stages (e.g., booking/check-in/staying/check-out/post-check-out), operational-level stages (e.g., day/week/month/quarter). Extend stages.json.
- One-Store-One-File Complete Structure: Design the complete Schema for one-store-one-file—five categories: basic archive + business archive + operations archive + governance archive + memory archive. Extend archive.schema.json.
- General Service Industry Abstract Model: Refine the general model of "four-layer closed loop + two cross-cutting concerns" (Input→Processing→Output→Feedback + Governance + Accumulation), ensuring reusability for other industries.
Output Requirements:
- Core judgment statement
- Operational object graph (Mermaid graph, mark existing/extended)
- Three-layer stage lifecycle model (Mermaid graph)
- One-store-one-file complete structure diagram (Mermaid graph)
- General service industry abstract model diagram (Mermaid graph)
Module 2: New Business SOP Design
Design Goal: Design a new business SOP covering all business operations in the industry, clearly defining "who does what, when, and what the standard is."
Design Steps:
- Establish SOP Design Principles: The core principle is "from human operation to human direction"—humans only do three things: supply, adjudicate, and accumulate; everything else is handled by Agent crews.
- Business Domain Division: Divide the industry's operations into several business domains (e.g., seven major domains for hotels: booking/check-in/staying/check-out/post-check-out/revenue management/daily operations).
- SOP Design for Each Business Domain: For each business domain, design the SOP using a unified table format:
- Step | Who (Agent/Person/Human-Computer Collaboration) | When (trigger conditions and time points) | What (list of actions) | Standard (acceptance criteria) | Exception Handling
- Traceability Chain Requirement (new in v1.1): Each SOP step must be traceable to a pain point/churn point number from Skill 2 research (e.g., "corresponds to Task 2 churn point 1: untimely price adjustment"). Steps without a traceable source must explain their design basis (e.g., "driven by compliance requirements"). This ensures the SOP is not designed in a vacuum but is "pain-point-driven."
- SOP Panoramic Flowchart: Use a Mermaid flowchart to draw the panoramic process for all business domains, showing the transition relationships between steps.
- Customer Segment Differentiation: For different customer segments in the target industry (e.g., low-star independent hotels/B&Bs/unmanned hotels for hotels), design differentiated configurations (implemented via customer-level Patch).
Output Requirements:
- SOP design principles
- SOP table for each business domain (unified format)
- SOP panoramic flowchart (Mermaid flowchart)
- Customer segment differentiation table
Module 3: Skills Development List and System Integration Architecture
Design Goal: List all Skills that need to be developed with their detailed specifications, and design the system integration architecture.
Design Steps:
- Skills System Panorama: Design a three-tier Skills system—Official Suite (distributed with Industry Bundle) + Team Skills (self-built per store) + Industry Shared (de-identified and listed). Use a Mermaid graph to draw the Skills system panorama.
- Detailed Specification for Each Skill: For each official Skill, clearly define:
- Functional description
- Trigger conditions
- Input data
- Output actions
- System integration
- Fence binding
- Key constraints
- Acceptance Tests (new in v1.1): Test cases that must pass before the Skill goes live (≥1 normal path + ≥1 abnormal path + ≥1 fence trigger path), ensuring the specification is "deliverable to R&D" rather than staying at the description level.
- Skills Development Priority: Based on the principle of "validate first, then replicate," use a Mermaid flowchart to plan the dependency sequence for Skill development (MVP → Pilot → Scale), without estimating timelines.
- System Integration Architecture: Design a five-layer system integration architecture (Business System Layer + Platform Layer + Hardware Device Layer + External Service Layer + Competitor Monitoring), drawn with a Mermaid graph.
- Five-Level Integration Method Layering: Based on HyperReality's five-level execution layering (L1 Official API → L2 Deterministic Adapter → L3 Deterministic Script → L4 Autonomous Exploration → L5 Manual Intervention), choose an integration method for each system. Draw the five-level layering strategy with a Mermaid flowchart.
- Data Flow Architecture: Design the complete data flow from source → aggregation → consumption → output. Draw with a Mermaid flowchart.
- Agent Crew Collaboration Topology: Design the collaboration relationships between multiple Agent presets (who calls whom, how data flows). Draw with a Mermaid graph.
Output Requirements:
- Skills system panorama diagram (Mermaid graph)
- Detailed specification table for each Skill
- Skills development dependency diagram (Mermaid flowchart, no timeline)
- System integration architecture diagram (Mermaid graph)
- Five-level layering strategy diagram (Mermaid flowchart)
- Data flow architecture diagram (Mermaid flowchart)
- Agent crew collaboration topology diagram (Mermaid graph)
Module 4: Landing Roadmap (Output only "what to do," forbid scheduling)
Design Goal: Plan a phased landing roadmap, with each phase clarifying goals, task lists, and success metrics.
Scheduling Ban (new in v1.3, mandatory): This module outputs only "what to do," and must not output any scheduling, duration, cycle, or time points (e.g., "X months," "X days," "2027 Q2," "Week N"). Reason: Time estimates without resource and organizational context can misguide landing—scheduling is an independent decision by the R&D team after receiving the task list, not the responsibility of this plan. Phases may only express sequential dependencies (who precedes whom, what unlocks what), not time durations. Milestone rhythm statements (e.g., SOP's "daily 08:30," "night shift 22:00-08:00") are product operation mechanisms and are not within the scope of the ban.
Design Steps:
- Phase Division: Typically divided into four phases—Base Consolidation → Full Coverage → Scale Promotion → Abstract Adaptation. Use a Mermaid flowchart to draw the phase dependency diagram (what unlocks what), prohibiting the use of Gantt charts or any timeline-based charts.
- Key Tasks for Each Phase: Clearly define what needs to be done in each phase (task list, without time estimates).
- Success Metrics for Each Phase: Clearly define how success is determined for each phase (quantifiable metrics). Milestone acceptance criteria must be quantifiable and verifiable by machine/data (reinforced in v1.1)—prohibit unverifiable statements like "basically usable" or "good experience." Replace all with indicators like "success rate ≥ X%," "on-time delivery rate ≥ Y%," "P95 ≤ Z minutes." Note: Times in acceptance criteria (e.g., "08:30 on-time delivery rate") are product operation SLAs, not project scheduling, and are allowed.
- Risks and Mitigations: Identify the main risks during the landing process and design mitigation strategies. The risk table must be standardized (new in v1.1): Each risk includes two dimensions: Probability (High/Medium/Low) × Impact (High/Medium/Low), and provides a trigger signal (what phenomenon indicates the risk is occurring; trigger signals must also avoid using project timeline terms; use observable phenomena like "integration testing repeatedly fails") and the mitigation responsible role; High-Probability × High-Impact risks must appear on the critical path of the roadmap.
Output Requirements:
- Landing Roadmap Phase Dependency Diagram (Mermaid flowchart, four phases, no timeline)
- Key Task Table for each phase (no duration column)
- Success Metrics Table for each phase
- Risk and Mitigation Table
Module 5: Value Increment Estimation
Design Goal: Estimate the quantifiable value HyperReality brings to the target industry, and design the pricing model.
Design Steps:
- Cost Reduction Value Estimation: Estimate the cost reduction value from AI substitution (replacing labor, saving time). Must be a range estimate (Conservative/Mid/Optimistic three scenarios) and include a key assumptions list (reinforced in v1.1), directly referencing and remaining consistent with the economic estimation methodology from Skill 2.
- Revenue Increase Value Estimation: Estimate the revenue increase value from AI enhancement (recovering churn, improving conversion). Again requiring range estimates + assumptions list; provide sensitivity analysis for the most sensitive assumptions.
- Comprehensive Value Model: Draw the comprehensive value model (cost reduction + revenue increase) with a Mermaid graph.
- Customer Segment Value Differences: For different customer segments, estimate value differences (e.g., three customer segments for hotels have different values).
- Pricing Model Design: Based on HyperReality's pricing system (Community Edition free + Professional Edition subscription + incremental profit sharing + resource exchange), design the pricing model for the target industry. Draw the pricing and ROI model with a Mermaid graph.
- Scale Revenue Forecast: Forecast revenue after scaled promotion.
Output Requirements:
- Cost reduction value estimation table
- Revenue increase value estimation table
- Comprehensive value model diagram (Mermaid graph)
- Customer segment value differences table
- Pricing and ROI model diagram (Mermaid graph)
- Scale revenue forecast table
Module 6: Abstract Adaptation and Summary
Design Goal: Identify reusable assets from the target industry, paving the way for cross-industry expansion.
Design Steps:
- Reusable Asset Accumulation: Identify reusable assets accumulated from the landing in this industry—model assets, mechanism assets, industry assets, methodology assets. Draw with a Mermaid graph.
- Cross-Industry Adaptation Preview: Preview the mapping for adaptation to the next target industry (e.g., adaptation table for Hotels → Restaurants).
- Strategic Vision Statement: Articulate the ultimate vision of "changing the industry, reshaping operations."
- Complete Solution Summary: Summarize the solution core in one sentence.
Output Requirements:
- Reusable asset diagram (Mermaid graph)
- Cross-industry adaptation mapping table
- Strategic vision diagram (Mermaid graph)
- One-sentence summary
Module 7: Platform Capability Feedback List (new in v1.3, independent output module)
Design Goal: During the solution design process, Skill 1 (Competitor Research) and Skill 2 (Frontline Research) will produce some high-quality content—competitors' validated capabilities, frontline real-world scenarios and know-how—that cannot be accumulated and absorbed within HyperReality's current capability scope (based on the code inventory list). This content should not be discarded or forcefully squeezed into the solution. Instead, it should be compiled separately as a "Platform Capability Feedback List" to help optimize the HyperReality platform system and the Skill system itself.
Identification Criteria (include if any one is met):
- Capabilities that competitors have but HyperReality's code does not have a corresponding mechanism (e.g., a competitor's type of tool environment, type of data network)
- Needs from frontline scenarios that the six assembly slots cannot accommodate (e.g., requires new mechanisms, new channels, new hardware adaptation types in the Base)
- Industry know-how that requires a new form of accumulation (types of experience that existing "Four Types of Memory/Skill/Fence" cannot express)
- Items in the solution design that are marked as "requires new build" but are beyond the scope of the Industry Bundle and are Base-level changes
Format for Each List Item:
| Field | Description |
|---|---|
| ID/Name | e.g., "Feedback-01: AI Voice Answering Channel" |
| Source | Skill 1/Skill 2 + specific section |
| Content Description | What this capability/scenario is, why it is valuable |
| Reason for Non-Absorption | Specific gap compared to the Code Capability Inventory (which package/slot is missing) |
| Platform Improvement Suggestion | What the HyperReality Base should add/extend (new mechanism/new channel/new slot/new package) |
| Expected Benefiting Scenarios | What scenarios are unlocked after the improvement |
| Priority Suggestion | P0 (blocker, cannot land key part of solution without it)/P1 (significantly enhances competitiveness)/P2 (nice to have) |
Design Steps:
- Throughout the solution design, continuously record "non-absorbable" signals (wherever you write "requires new build," "Base does not support," "beyond current capabilities," check if it is a Base-level gap)
- After completing the six modules, consolidate and deduplicate, organize into a list according to the above format
- Sort by priority, and for P0 items, must specify "which part of the solution is blocked"
Output Requirements:
- Platform Capability Feedback List table (sorted by priority)
- Each item includes source traceability (Skill 1/2 + section)
- This list is an independent module of the solution (separate section or appendix), separate from the Industry Bundle solution body—it serves HyperReality platform evolution and is not part of the industry landing scope
3.3 Design Methods
Method 1: HyperReality Code Inventory (Primary Source of Truth, Remade in v1.2)
Before solution design, a thorough inventory of the HyperReality code must be performed (deeper than the lightweight reading in Appendix A), producing a "HyperReality Code Capability Inventory and Industry Configurable Scope" document to serve as the "Base Fact Appendix" for the solution:
Inventory List (by path):
| Priority | Path | Inventory Goal |
|---|---|---|
| P0 | README.md + CHANGELOG.md | Current version status, repository map, recent evolution |
| P0 | bundles/<reference industry>/ full directory | Six assembly slot artifacts: bundle.json asset list, schemas (objects/stages/archive), fences (rule details and default_level), presets (Agent and fence binding), skills, ui |
| P0 | packages/shared/src/event-schema.ts + enums.ts + constants.ts | Five-element event schema freeze scope (v1 frozen, only context/object/decision can be loose extended), global enum freeze list, industry-independent default values |
| P1 | packages/base/ nine-domain packages | workdata (gateway three-stage waterfall/hash chain/idempotency/PII/memory three-level scope), fence-engine (three-level judgment/monotonic guard/dry-run/object write lock), review-console (three gestures/rejection backflow), night-shift (state machine/decision package three columns/one-click pause SLA), inspection (read-only inspection/anomaly classification/dispatch), skills (three-tier marketplace/forge/consciousness system), tenancy (four-version capability matrix), model-router (peak-valley/degradation chain/event-level metering) |
| P1 | packages/runtime/ | Intent routing (Ask/Agent/Quest), Quest loop (assembly three-element check/breakpoint resume/acknowledgement not verified not allowed to complete) |
| P2 | packages/base/bundles/assembly.ts | Six assembly slot assembly contract, pre-flight checklist, activation flow |
| P2 | scripts/ | migrate/seed/suite (371 test cases)/dsh-gate (crash replay/validation chain/idempotency gate)/verify-chain |
| P2 | docs/DECISIONS.md, docs/03-功能清单-用户版.md | Key ADR decisions, user-version full feature list |
Inventory Output (must be persisted as an appendix to the solution):
- Base Capability List: capability name → code path → key constraints (e.g., "fence evaluation exception follows block E2.1")
- Industry Configurable Scope Table: what can be changed (six assembly slot content, fence thresholds, write action prefix registerWriteActions, task tier table TASK_TIER_TABLE, degradation chain workspace override) / what is frozen and cannot be changed (Five-element event v1 schema, global enums, append-only/RLS/gateway related)
- Existing Industry Bundle Gap List: what the solution wants vs. what the code already has (e.g., "wants 16 object types, code currently has 8 types"), gaps equal R&D workload
- Reference Anchor Table: each HyperReality capability reference in the solution body → code path
Discipline: The solution is forbidden from referencing a capability that does not exist in the code without marking it as "planned/needs new build"; when a PRD conflicts with the code, the code prevails and this should be noted (e.g., if a PRD claims a capability that the code has not implemented, it is listed in the solution as "needs new build" rather than "exists").
Method 2: Integrate Outputs from Skill 1 and Skill 2
- Differentiated competitive points from Skill 1 → guide the positioning strategy of the landing plan
- AI substitution feasibility matrix from Skill 2 → guide fence rule design
- Workflow decomposition from Skill 2 → guide SOP design
- Industry know-how from Skill 2 → guide Skills methodology
Method 3: Deep Collaboration with Senior Industry Partners
- Collaborate deeply with senior industry partners to validate the feasibility of the plan
- Industry partners provide know-how input and system interface resources
- Solution design should be "bold and aggressive" because resources are abundant
IV. Input Contract
4.1 Required Inputs
| Input Item | Description | Source |
|---|---|---|
| Skill 1 Output | Industry benchmark in-depth competitor research document | Skill 1 output |
| Skill 2 Output | Industry frontline operations research document | Skill 2 output |
| HyperReality Code Inventory Output | "Code Capability Inventory and Industry Configurable Scope" (produced per Method 1, primary source of truth) | Pre-inventory for this skill (repository: github.com/workloom-ai/workloom-im) |
4.2 Recommended Inputs
| Input Item | Description | Source |
|---|---|---|
| Industry Partner Know-how | Industry experience and system interface resources from senior industry partners | Provided by industry partners |
| Existing Industry Bundle Reference | Already-running Industry Bundle (e.g., Hotel Bundle) as reference | HyperReality code repository |
| Target Industry System Interfaces | Interface documentation for target industry's PMS/POS/booking systems, etc. | Provided by industry partners |
| HyperReality PRD | Product Requirements Document (background reference for understanding design intent; code prevails in conflict; used as fallback fact source when code is unavailable, with this noted) | Provided by HyperReality team |
4.3 Input Validation
- Complete outputs from Skill 1 and Skill 2 are required
- HyperReality code inventory must be completed and the "Code Capability Inventory and Industry Configurable Scope" must be persisted (if code is unavailable, use the fallback summary in Appendix A and clearly mark it as "not verified against real-time code")
- Input from industry partners' know-how is required (or explicitly mark as "extrapolated based on public information")
V. Output Contract
5.1 Deliverables
A complete industry landing solution document, Markdown format, including:
- Solution Positioning Statement (declaration of full AI restructuring)
- Chapter 1: Industry Abstract Model (from industry operations to service industry operating system)
- Chapter 2: New Business SOP Design (full business process restructuring)
- Chapter 3: Skills Development List and System Integration Architecture
- Chapter 4: Landing Roadmap and Value Increment Estimation
- Chapter 5: Abstract Adaptation and Summary (from target industry to full service industry)
- Chapter 6: Platform Capability Feedback List (Independent module: high-quality content from Skills 1/2 that HyperReality's current capabilities cannot absorb → platform improvement suggestions, new in v1.3)
5.2 Output Specifications
| Specification | Requirement |
|---|---|
| Format | Markdown, all diagrams using Mermaid syntax |
| Length | No less than 15,000 characters (output in 5 chapters) |
| Mermaid Diagrams | At least 10 (architecture diagrams, sequence diagrams, state diagrams, phase dependency diagrams, etc.; Gantt charts and other timeline-based charts are prohibited) |
| SOP Format | Must be presented in a table format (who does what when) |
| Abstract Adaptation | Each module must end with an explanation of "how to abstractly adapt to other industries" |
5.3 Output Validation
- Is there a Solution Positioning Statement (full restructuring declaration)?
- Is there an Industry Abstract Model (Five-element event modeling + three-stage lifecycle + one-store-one-file)?
- Is there a New Business SOP (covering all business domains, table format)? Does each step have a pain point traceability chain?
- Is there a Skills Development List (detailed specification for each Skill)? Does each Skill have acceptance test cases?
- Is there a System Integration Architecture (five layers + five-level layering)?
- Is there a Landing Roadmap (four-phase dependency diagram, no timeline)? Are all milestone metrics quantifiable and verifiable?
- Is there a Value Increment Estimation (cost reduction + revenue increase + pricing)? Is it a range estimate with assumptions list? Is it consistent with the estimation methodology from Skill 2?
- Does the risk table include Probability×Impact + trigger signal + responsible role?
- Is there an Abstract Adaptation explanation (cross-industry mapping)?
- Is there a Platform Capability Feedback List (independent module, each item includes source traceability + reason for non-absorption + improvement suggestion + priority)?
- Is the entire document free of any scheduling/duration/time points (Gantt charts, "X months," "X days," "2027 Qx," etc. are all prohibited; SOP trigger times and product SLAs are exempt)?
- Are there ≥10 Mermaid diagrams? And are 100% of them actually rendered as graphics in the final deliverable?
- Is the document header marked with the information cutoff date?
- Does the word count meet the requirement (≥15,000 characters, for fusion mode count the total information volume of "old + new supplements")?
- In iterative fusion mode: does it include an old/new comparison table, conflict adjudication records, and fusion conclusion?
VI. Quality Standards
6.1 Depth Standards
- Full Coverage: The plan must cover all business operations of the industry, not just a few points
- HyperReality Product Philosophy as Skeleton: The core architecture must be based on the HyperReality Base, not a separate system
- High-Level and Deeply Detailed: Has both strategic height and execution details
- Deliverable to R&D Team: Skills have specifications, architecture has a strategy, roadmap has nodes, value has an estimation
6.2 Executability Standards
- SOP must be convertible into Agent preset configurations and fence rules
- Skills must have detailed specifications (function/trigger/input/output/integration/fence)
- System integration must have a five-level layering strategy
- Roadmap must have clear phase dependencies, task lists, and quantifiable success metrics; must not include any scheduling/duration/time points (v1.3)
- Value estimation must support pricing decisions
6.3 Abstractness Standards
- The industry abstract model must be reusable for other service industries
- Each module must include an "abstract adaptation to other industries" explanation
- Reusable assets must be clearly identified (Model/Mechanism/Industry/Methodology four categories)
6.4 Format Standards
- Mermaid diagrams must be copyable into Mermaid-supporting editors for direct rendering
- SOP must use a table format (Who/When/What/Standard/Exception)
- Skill specifications must use a table format
- Roadmap must use a phase dependency diagram (flowchart), Gantt charts and any timelines prohibited; SOP trigger times (e.g., "daily 08:30") are product operation mechanisms and are allowed
VII. Abstract Adaptation Notes
7.1 Reusability of This Skill
This skill is an industry-independent meta-methodology. The six-module design framework (Abstract Model + SOP + Skills Architecture + Roadmap + Value Estimation + Abstract Adaptation) is applicable to any industry's HyperReality landing solution design.
7.2 Steps for Adaptation to Other Industries
- Obtain outputs from Skill 1 and Skill 2: Complete competitor research and frontline operations research for the target industry
- Replace industry terminology: Replace "hotel" with the target industry terminology
- Keep the six-module framework unchanged: The six-module design framework is fully reusable
- Industry-specific adjustments: Adjust the design focus of certain modules based on industry characteristics (e.g., for restaurants, the "system integration" focus is POS and delivery platforms; for hotels, the "system integration" focus is PMS and OTA)
- Reuse already accumulated assets: Reuse model assets, mechanism assets, and methodology assets from already-running industries (e.g., Hotels)
7.3 Verified Industries
- ✅ Hotel Industry (HyperReality Hotel Edition Landing Plan, framework feasibility verified)
- 🔜 Restaurant Industry (to be invoked after Skill 1 and Skill 2 are completed)
- 🔜 Beauty Industry (to be invoked after Skill 1 and Skill 2 are completed)
- 🔜 Education and Training Industry (to be invoked after Skill 1 and Skill 2 are completed)
7.4 Cross-Industry Reusable Asset Reference
| Asset Type | Accumulated from Hotel Industry | Reusable To |
|---|---|---|
| Model Assets | General Business Model (four-layer closed loop + two cross-cutting concerns) | All service industries |
| Model Assets | 16-Type Operational Object Map | Reusable after replacing objects |
| Mechanism Assets | Five-Element Event Library + Fence Engine + Night Shift Crew | Comes with HyperReality Base, reused across all industries |
| Methodology Assets | AI Substitution Feasibility Matrix | All service industries |
| Methodology Assets | SOP Design Template | All service industries |
| Methodology Assets | Value Estimation Model | All service industries |
VIII. Invocation Examples
8.1 Invocation Template
Invoke Skill: workloom-industry-landing-design
Input:
- Target Industry: Restaurants
- Skill 1 Output: In-depth competitor research document for the restaurant industry
- Skill 2 Output: Frontline operations research document for the restaurant industry
- HyperReality Code Inventory: Clone the latest main branch, produce the "Code Capability Inventory and Industry Configurable Scope" per Method 1
- HyperReality PRD: Background reference (optional, used as fallback)
- Industry Partner: Senior industry partner from the restaurant industry
Output:
- HyperReality Restaurant Edition Landing Plan (≥15,000 characters, ≥10 Mermaid diagrams all actually rendered, no scheduling)
- Independent Module: Platform Capability Feedback List
- Appendix: "HyperReality Code Capability Inventory and Industry Configurable Scope" (including reference anchor table)
8.2 Integration with HyperReality Base
This skill, as the "industry landing top-level design" skill, is recommended to:
- Be categorized as an official suite (distributed with the HyperReality Base)
- After installation, be invoked by the Industry Delivery Engineer Agent or Product Architect Agent
- The output Industry Abstract Model → converted into Industry Bundle schemas (objects.json/stages.json/archive.schema.json)
- The output SOP → converted into Agent preset configurations and fence rules
- The output Skills List → converted into SKILL.md files
- The output System Integration Architecture → guides L1-L5 adapter development
- The output Roadmap → guides R&D task decomposition (scheduling is an independent decision by the R&D team)
- The output Value Estimation → guides business pricing
8.3 Collaboration Flow for the Three Skills
flowchart LR
S1[Skill 1
industry-benchmark-research
In-depth competitor research]
S2[Skill 2
industry-frontline-research
Frontline operations research]
S3[Skill 3
workloom-industry-landing-design
Complete landing solution design]
WL[HyperReality Base
PRD+Code]
S1 --> S3
S2 --> S3
WL --> S3
S3 --> O1[Industry Abstract Model
→ schemas]
S3 --> O2[New Business SOP
→ preset+fence]
S3 --> O3[Skills List
→ SKILL.md]
S3 --> O4[System Integration Architecture
→ L1-L5 adapters]
S3 --> O5[Landing Roadmap
→ R&D task decomposition]
S3 --> O6[Value Estimation
→ Business pricing]
style S3 fill:#fff3e0
style WL fill:#e3f2fd
IX. Delivery Quality Gate and Iterative Fusion Rules (new in v1.1)
9.1 Delivery Quality Gate (Pre-Delivery Gate)
Before delivery, each gate item must be checked; if any item fails, delivery is prohibited:
| Gate Item | Standard | Inspection Method |
|---|---|---|
| Diagram Rendering Rate | All Mermaid diagrams in the final deliverable are actually rendered as graphics, rendering rate is 100%; fewer than 10 diagrams is an automatic fail | Manual/visual inspection; automatic fail if any diagram contains ````mermaid` without a corresponding rendered image |
| Roadmap Purity (new in v1.3) | The roadmap section contains absolutely no scheduling/timeline/duration/time point statements; all phases only express sequential dependencies | Full-text search [0-9]+月 (X month), [0-9]+天 (X day), 202[5-9], [0-9]+周 (X week), [0-9]+日 (X day); automatic fail if any match; SOP trigger times and product SLAs are exempt |
| Traceability Chain Completeness (new in v1.1) | Each SOP step has a traceable pain point/churn point number from Skill 2; steps without traceability have an explanation of design basis | Spot-check ≥3 business domains, 100% compliance required |
| Skill Acceptance Test Completeness (new in v1.1) | Each Skill has ≥1 normal path + ≥1 abnormal path + ≥1 fence trigger path acceptance test case | Spot-check ≥3 Skills, 100% compliance required |
| Risk Table Standardization (new in v1.1) | Each risk has two dimensions: probability × impact, trigger signal (not use project timeline), and responsible role; high × high risks appear on the critical path | Full risk table inspection |
| Code Fact Discipline | The solution does not reference a capability that does not exist in the code without marking it as "needs new build"; all conflicts with the PRD are marked; each capability reference has a code path anchor | Spot-check ≥5 capability references against the Code Capability Inventory appendix; automatic fail if a false claim is found |
9.2 Iterative Fusion Mode Operations Guide (new in v1.1)
Scenario: The previous version of the landing plan already exists, and this invocation is based on updated information (new Skill 1/Skill 2, new code version, new industry know-how) for iterative fusion.
Guarantee Principles:
- All outputs from the previous version are the baseline, incremental updates only supplement changes → prohibit regenerating the full text from scratch, only produce "old version + supplements" fusion output
- Conflicts are resolved with the latest information and code, and the resolution record must be retained
- The platform capability feedback list is rebuilt from scratch every time (since platform capabilities change, previously unabsorbable items may become absorbable)
Iteration Steps:
- Load the previous version of the solution document (baseline)
- Compare new inputs vs. old inputs, identify change points (new Skill 1 conclusion, new code capabilities, new pain points, etc.)
- For each change point, determine whether it triggers module updates: a. No change → keep the old version content (mark as "unchanged") b. Incremental addition → add new content to the old version (mark as "increment") c. Conflict → replace old content with new content, and add a conflict resolution annotation (conflict point, old wording, new wording, resolution basis, e.g., "Based on 2025-01-15 new code survey, the fence engine now supports X mechanism, updating from Y to Z")
- Non-change-point sections keep the old version, change-point sections output "old + new supplement" fusion; the final deliverable must include an old/new comparison table and a conflict resolution record
- Completely rebuild the platform capability feedback list from scratch (refer to Section 3.2 Module 7)
Fusion Output Format:
- Complete final deliverable (unchanged old content + incremental new content + conflict resolution content)
- Appendix: Old/New Comparison Table (list all change points: module → change type (unchanged/increment/conflict) → old version → new version) and Conflict Resolution Record (each conflict: conflict point → conflict description → resolution basis → resolution result)
X. Appendix A: Code Knowledge Quick Reference (Fallback Version, Must Be Superseded by Real-Time Code)
This appendix provides a knowledge base for quickly understanding the HyperReality code structure without reading the code, suitable as a starting point and fallback for input to this skill. It must be explicitly noted: "This appendix content is a static document and may be out of date; after real-time code inventory, the XXX code path is the primary source of truth".
(Content of Appendix A and subsequent chapters omitted for brevity, but the structure and principles should follow the original document's full specification.)