Rendering Submission & Successful Source Acceptance
Two Paths
- New Generation Path: Only for missing shots or shots explicitly authorized for re-generation by name. Enters a new freeze request, budget, and G8 submission.
- Successful Source Path: Immediate acceptance into formal post-production when the supplier is truly successful, and the task/project/shot/input/current artifact bytes match. Does not reopen old shot scripts, makeup tests, or quality reviews.
Identity, costume, action, quality, nominal duration, lip sync, dialogue, and voice quality are not default gates for successful source post-production. Source audio is preserved; ASR, TTS, LLM, or frame-sampling voting are not invoked by default. Component upgrades and historical quality rejections cannot trigger re-payment for the same successful source.
New Task Parameters & Pre-checks
| Item | Required Fact | Failure Path |
|---|---|---|
| Script version | CMS current frozen version & parent_version | Version/content mismatch blocks submission |
| Makeup/Material binding | Binding-manifest & usage for this new generation | Missing authorization or incorrect usage blocks |
| Approval & budget | Current G8/budget/payment authorization | Without approval, no spending allowed |
| Tenant & project | Task belongs to this scope | Receipts not reusable across tenants |
| Submission parameters | Valid frame size, first frame, negative constraints & plan parameters for the current shot card | Illegal request explicitly rejected |
| Task idempotency | Submitted task_id corresponds to version | Unknown/in-polling tasks cannot be double-billed |
These checks only apply to shots to be newly generated. For already successful old shots, reference photo expiration, historical card format, current plan, or director component changes do not require re-running their paid pre-checks.
SOP & Receipts
- Trigger a new generation request; fix project/shot number/script version/material license/budget & approval; receipt records frozen input. Failure blocks submission; do not default to modifying requirements.
- Submit once and save the real task_id, request version, and cost. Manual single-shot, batch, and authorized automation all follow the same boundary; without a submission receipt, generation cannot be claimed.
- Poll based on actual task_id and backfill status. For still-processing, unknown, or timeout, retain status; prohibit blind resubmission of the same shot to prevent duplicate billing.
- After supplier succeeded, verify real files, project/shot number, task source, input/artifact SHA256; append independent acceptance receipt and enter formal post-production; quality score null.
- For historically successful sources rejected by old quality checks, use the same source verification; old quality failure logs remain read-only, acceptance expressed as new records; new requests only handle ungenerated or explicitly named new shots.
Source & Acceptance Parameter Boundaries
- Supplier failed, source error/gateBlocked, or task mismatch cannot fake succeeded.
- Current source bytes must be bound to the real successful task/frozen source; tampering, missing, or unreadable causes explicit failure.
- Original input and historical logs must never be overwritten in place; canonical acceptance/post-production copies cannot modify raw bytes.
- Post-production component recipe changes cannot cause already successful sources to resubmit; real missing files/source failure cannot pretend acceptance.
- New generation authorization, payment, tenant, and G8 must exist independently; successful source acceptance does not expand permissions.
Failure Diagnosis (Symptom → Cause → Resolution)
| Symptom | Detector/Cause | Resolution |
|---|---|---|
| Submission rejected | Current new task script/parameters/material binding | Fix current new request; keep rejection; does not affect already successful old shots |
| Long no backfill | task_id polling actual status | Record unknown/timeout; verify same task; do not blindly resubmit |
| Supplier failure | Real failed status & error code | Save failure; new requests need original authorization/budget; cannot auto-retry based on quality |
| Success file missing/corrupt | Actual file/read/process | Explicitly mark missing or processing failure; cannot replace with quality pass |
| Project/shot/source hash mismatch | Frozen task and current bytes | Source failure; block spoofing |
| Already successful shot rejected by old identity/costume etc. | Historical quality log | Append acceptance after source verification; do not delete old failures; do not re-pay |
| Budget or payment mismatch | Original G8/payment/tenant fence | Block new generation; cannot bypass gate |
Output Contract
For new generation, save script version, approval card, task_id, cost, and real supplier result; for acceptance, save real source, current source SHA256, new acceptance record, unassessed declaration, and formal post-production result. Key data without tool evidence is marked unverified; historical failures and new acceptance can be reconciled simultaneously.