What does Tracklane Devtool Landing do?
Produce the marketing site of a developer tool that feels like a finished, real company site: warm and approachable, precise, with the product itself as the hero. A technical buyer should understand in one glance what the tool does, see it working, see how it fits their everyday work (Git, CLI, API), find a clear path to evaluate it (import, pilot, security review), compare plans and sign up or book a demo. Every one of those paths must work.
The blueprint is references/template.html (fictional brand Tracklane, sample
customer workspace Kestova). Open it in a browser first; it loads
references/images/ beside it and its fonts from the fontsource CDN. Every
Tracklane, Kestova, customer and person name in it is sample content: the
validator fails a finished site that still contains any of them.
Files
references/template.html: the complete reference implementation: tokens, CSS, SVG icon sprite, product UI rendered from data arrays, hash router with 11 routes, forms, dark theme. Start from it.references/style-guide.md: tokens, type scale, color, layout, radius and shadow scales, component anatomy, do and don't.references/section-inventory.md: home sections in order, routes, data arrays and the numbers that must stay consistent.references/image-plan.md: art direction, every image slot, crops, prompts.references/motion-system.md: motion tokens, what animates and why, reveal fallback, reduced motion.references/quality-checklist.md: the pre-delivery checklist.references/icon-library.md: sprite icons, product glyphs, wordmark marks.references/images/: generated photos and cropped avatars (see "Adapting to a real brief" for which ones may be reused).scripts/inline-assets.mjs: builds the single offline HTML file (embedsimages/,fonts/,assets/files and downloads the fontsource woff2 files).scripts/validate-template.mjs: validator for your site, the template, the store demo and framework project folders.
Workflow
1. Collect the product facts
Ask for (or infer from what the user gave): product name, one-line promise, the work objects the tool manages (issues, incidents, deploys, tickets...), the three views worth showing in the hero, five capabilities for the bento, how it connects to the developer workflow (branches, pull requests, CLI, API), integrations by category, security facts, evaluation path, pricing tiers and limits, primary CTA (sign-up, waitlist or demo), company facts for the About route. Fill gaps with plausible specifics and list every drafted fact in your final reply; never lorem ipsum, "Your Company", "Acme" or "Jane Doe". For a real product use only claims the user confirms; never invent certifications, customers or ratings for a real company.
Pick one sample customer workspace and reuse it everywhere the product appears (hero, bento, workflow code, audit log). Keep numbers consistent across sections (see the inventory).
2. Choose the output target
- Single HTML file (default, no existing project): copy
references/template.htmland theimages/you keep into a working folder (for examplesite/index.src.htmlandsite/images/), rebrand it there, then build the deliverable withnode scripts/inline-assets.mjs site/index.src.html site/index.html. The result is one offline file with fonts and images as data URIs, like the store demo; it also runs inside a sandboxed preview frame. - Deployed static site (the user hosts it themselves): the same page may
keep its photos in
images/and the three woff2 files infonts/beside it (point the@font-facesrcatfonts/<file>.woff2); no remote hosts. - Existing or framework project (inspect
package.jsonand conventions first): port the same structure into the host's idioms instead of pasting the file. Next.js App Router:app/page.tsxcomposes one component per home section; routes becomeapp/pricing,app/changelog,app/signin,app/signup,app/demo,app/security,app/customers/[slug],app/about,app/(legal)/privacy,app/(legal)/termsandapp/not-found.tsx; data arrays (ISSUES,PLANS,CMP,CL,TRIAGE,CMDS,VEL) move todata/*.ts. Fonts vianext/font/google(Inter_Tight,Inter,Geist_Mono) or@fontsource-variable/inter-tight,@fontsource-variable/interand@fontsource-variable/geist-mono, mapped to--f-display,--f-sans,--f-mono. Icons fromlucide-reactwith the same names. Theme withnext-themestogglingdata-theme. Images vianext/imagewith the sameobject-position. With Tailwind v4 put tokens in@theme/ CSS variables, never hard-coded hex values. Vite/React, Vue, Svelte and Astro follow the same split. Keep the product UI as real components with state (tabs, card moves, switches), never as screenshots. - The visual contract (tokens, type scale, section order, radius scale, motion tokens, the bleeding product window) is identical in every stack.
3. Plan sections and copy
Follow references/section-inventory.md. Keep the signature order: hero with
the product window, wordmark marquee, metric cards, workspace bento, cycles
tabs on the mint band, developer workflow, evaluation path, security,
customers (quote carousel and story card), pricing, FAQ, CTA band, footer. Use
at least eight layout families; never stack three image-and-text splits.
Copy rules: hero headline is a short imperative on one line (about 20 characters, no period), then a one-sentence muted subtitle (about 15 words) and four feature notes (two-to-three-word title plus one short line); section headlines 4 to 8 words; leads under 30 words; concrete numbers; sentence case. Two-tone headings (ink sentence plus a muted second sentence) at most twice per page. No em or en dashes, no filler verbs ("elevate", "seamless", "unlock", "supercharge"), no eyebrow above every heading and no announcement pill (a release note rides in the hero's secondary button). One label per intent everywhere: "Start free" for sign-up, "Book a demo" for sales, "Sign in" for the app.
Rebuild the product UI around the user's real objects: rename board columns, issue IDs, labels, views, chart series, roadmap projects and audit events; keep the data believable (IDs, dates, owners, points that add up).
4. Plan and produce the imagery
Use references/image-plan.md. The product is drawn in HTML/CSS/SVG and is
never a photo or a generated screenshot. Write one art-direction sentence, then
define photo slots by role, only where a real company site uses photography:
customer portraits for the quote carousel, the customer story, the team photo
on About, and one contact sheet cropped into avatars for the product UI.
Generate in one batch, look at every image, regenerate anything off-brief or
with text, logos, screens or artifacts. Set crops with object-position.
Fictional customers get typeset wordmarks with simple geometric marks, never
real logos; integrations are named by category with Lucide icons, never with
third-party brand marks.
5. Build to the craft bar
- Tokens, type, layout and components exactly as
references/style-guide.md: Inter Tight display at weight 620 (hero headline 650 at 54px, never larger) with -0.02 to -0.03em tracking, section h2 at most 48px, Inter text at 1.6 line height, Geist Mono for IDs, keys and code, one lane-green accent, near-black ink buttons, tinted sand and mint neutrals, hairline borders and layered warm shadows. Light theme first; the dark theme must fully work. - Motion per
references/motion-system.md: content visible without JS, hero in under a second, reveals once, product events once and only while visible, auto-advancing tabs run one loop and pause on hover, focus and offscreen, a single marquee, fullprefers-reduced-motionsupport. - Interactions complete: sticky header that gains a backdrop, scroll-spy nav underline, product dropdown (hover and click), focus-trapped mobile sheet with Esc, hero view indicator (a tablist driving the product window) with keyboard arrows, live board card move (FLIP), triage accept/snooze/decline with empty state and reset, thread reply, access switches with saved feedback, command palette filter with empty state, cycles tabs, automation rule switches, capacity rebalance with undo, velocity range switch, code tabs with copy, quote carousel (buttons, thumbnails, swipe, arrows), billing switch with rolling prices, comparison table with a mobile plan picker, accordions, changelog filter and search with empty state, and CTA, newsletter, sign-in (SSO lookup, reset), sign-up, demo and security-pack forms with inline validation, loading, success and toast.
- Accessibility: landmarks, skip link, one h1 per view (focused on route
change), labels above inputs,
aria-invalidandaria-describedbyon errors, roles and states for tabs, switches, radiogroups and accordions, 44 px touch targets, AA contrast in both themes. - Icons: inline SVG per
references/icon-library.md; never emoji or dingbats.
6. Single-file build and sandbox constraints
Build the single file with node scripts/inline-assets.mjs <source.html> <index.html>: it inlines every images/, fonts/ and assets/ reference as a
data URI, downloads each https://cdn.jsdelivr.net/fontsource/fonts/...woff2
named in the @font-face rules once and embeds it (if a download fails it
stops and says so; never ship a file that still loads a remote font), and
embeds an image used by several <img> slots only once.
Sandbox restrictions apply when the page is previewed inside a sandboxed iframe
(a single-file demo). A deployed site or framework project does not need them,
but the template already follows them, so keep them. Make zero network requests, no
alert/confirm/prompt/window.open, wrap storage in try/catch with an in-memory
fallback. It must run inside <iframe sandbox="allow-scripts">: intercept every
# link on click and render the view from JS (sync the URL with
history.pushState inside try/catch only), drive forms from type="button"
handlers plus an Enter-key handler (the sandbox blocks native submission before
submit fires), and skip the Clipboard API when window.origin === 'null'
(fall back to execCommand('copy')). Reference each asset path once (avatars as
CSS classes, a repeated photo cloned at runtime) so inlining does not duplicate
files. Keep the built file under 5 MB (hard cap 8 MB). Remove any vendor badge;
the site must look like the customer's own.
7. Validate and review in a browser
node scripts/validate-template.mjs site/index.htmlon the built file (strict: offline, everything inlined, size budget, and no Tracklane sample identity left). Use--filesfor a deployed site that keepsimages/andfonts/beside the page, pass the project folder for a framework port, and--no-signatureonly after a deliberate restyle.--templateis forreferences/template.htmlitself and--demofor the store demo; neither is for your output. Route names are yours: the validator only requires ahomeand a404view, at least four other views, eight home sections, one h1 per view and links that resolve.- Screenshot at 360, 390, 768, 1024, 1440 and 1920 px, light and dark. The hero must keep its fixed composition (style guide, "Hero anatomy"): 54px one-line headline about 63px under the header, the product frame top-aligned with it on the right on desktop and below the indicator on phones, no purple anywhere, and nothing may scroll horizontally.
- Click through every nav and footer link, each route and back, every form (empty submit, fix, success), filters and search down to their empty states, the mobile sheet (Esc closes), theme toggle, billing switch, hero indicator and cycles tabs. Repeat the key flows inside a sandboxed iframe for demos.
- Confirm zero console errors, then walk
references/quality-checklist.md.
Adapting to a real brief
- Counts flex; the grammar does not. Plans: 2 to 4 entries in
PLANS; eachCMProw holds one value per plan (the comparison table followsPLANS), keep thedata-cmppicker buttons in step with the plan ids, and set.planstorepeat(n,minmax(0,1fr))(two plans: cap its width at about 820px). Quotes: 2 to 5.qs-slidefigures with a matching.qs-thumbeach (data-qs0..n-1,aria-label="1 of n"); the phone thumb row sizes itself. Bento stays five tiles, cycles tabs three to four, the evaluation track three steps, security facts 2x3, FAQ four to eight items, changelog any number ofCLentries. Wordmarks (MARKS) need six or more for the marquee to fill; with fewer, drop the marquee row. - Map the sections to the product. The board, burn-up and roadmap are
the hero views of any tool that moves work through states. An incident
tool: columns become Triggered, Acknowledged, Mitigated, Resolved, the
burn-up becomes open incidents over the on-call week, cycles tabs become
escalation policies, runbooks, postmortems and insights. A CI or deploy
tool: columns are Queued, Building, Testing, Deployed; the roadmap rows
are release trains; the workflow tabs show the CLI, the config file and
the API. A support desk: tickets, SLAs and queues. Rename
COLS,ISSUES,LABELS,TRIAGE,CMDS,VEL,HEATand the code panels, keep the layouts. - Real facts only. For a real product, customer names and logos, quotes, metrics ("2,400 companies", "-61% carry-over"), the customer story, team size, founding year, addresses, open roles, prices and changelog dates come from the brief. Anything missing is drafted as clearly plausible placeholder copy and listed in your final reply for the user to confirm or replace; with no real customers, drop the marquee, quote carousel and story route rather than inventing them. No invented certifications (SOC 2, ISO 27001, HIPAA, GDPR claims), uptime figures, awards or ratings: keep the security section to facts the user confirms.
- People photos. If the site shows a real team or real customers, ask
for their photos and apply the same crops (
object-position). Generated portraits are stand-ins only; say so in the final reply. - Shipped images. Reusable as neutral placeholders:
av-*.webp(nine product-UI avatars of fictional users) andstory-vantri.webp(a generic team planning at a sticky-note wall; rename the file and rewrite its alt). Stand-ins only, to replace with real people or regenerate:quote-rhea,quote-jonas,quote-amara,quote-kenjiand theirqf-*face crops (sample customers), andteam-tracklane.webp(the sample company's team with an office dog; never present it as the user's team). - Deliverable. No existing project: the single HTML file from
scripts/inline-assets.mjs(step 2 and 6), like the store demo; this is the default. A deployed static site may keepimages/andfonts/beside the page (validate with--files). A framework project, or when the user asks for one: port per step 2 with local image and font files. - The hero copy changes, its anatomy does not. New one-line headline (about 20 characters), subtitle, four feature notes, the same two buttons and the "1 of 3" indicator driving three product views.
- Replace checklist (strings outside the data arrays):
<title>, meta description andog:*tags; every view'sdata-titlesuffix; the header and footer brand plusaria-label="... home"; the hero.apparia-labeland the workspace chip (.ws-logoinitial and name); the marquee title; audit-log emails; the CLI package, command output, API host and token variable in the workflow code panels; the sign-up workspace placeholder and thetracklane.dev/address prefix (markup and thedata.slugline in the form script); security, privacy and careers emails; the legal address; the story route/customers/vantri(ROUTESand its links); image file names (team-tracklane,story-vantri); the comment headers. The validator names any sample string still present.
Typography
Fonts: Inter Tight (variable), Inter (variable) and Geist Mono (variable). The
template loads them from the fontsource CDN. In a framework project install
@fontsource-variable/inter-tight, @fontsource-variable/inter and
@fontsource-variable/geist-mono or use next/font/google (Inter_Tight,
Inter, Geist_Mono); the single-file build inlines the three woff2 files as
data URIs (scripts/inline-assets.mjs, step 6), and a deployed static site
serves them from fonts/ beside the page. Swap
a family only on purpose (for example to match the user's brand type) and
update --f-display, --f-sans and --f-mono together.