Product Management
Maintain a single chain of product truth from requirement collection to acceptance sign-off. Product documentation explains why to do it, what to do, and how to accept it, without impersonating technical implementation or release completion evidence.
The product initialization template is exclusively held by this Skill: when needing to establish a requirements backlog, PRD, roadmap, or iteration plan, use product-governance assets; do not create a second set of product templates under the project management directory.
Before writing project artifacts, first read the project entry and reuse existing semantic owners. The BuildOS default template is only for new initialization instances; mature projects must first be mapped and authorized, and it is forbidden to create default directories or parallel sources of truth.
How It Works
- Collect raw requirements and retain source, target users, problem, expected outcome, type, and owner. For ideas requiring significant investment, with weak evidence, unclear direction, or where existing alternatives may exist, first conduct ad-hoc opportunity assessment: distinguish facts from assumptions, examine supporting and opposing evidence, compare doing nothing, reuse/buy, and the minimal solution, then decide to proceed with clarification, move to requirements, defer, or reject. Low-cost, reversible small changes do not mandate a full discovery process.
- Clarify scope, non-goals, business rules, constraints, dependencies, risks, success metrics, and acceptance criteria.
When starting from natural language requirements, perform requirement refinement, key ambiguity resolution, and value slicing as needed within existing REQ/PRD and associated numbered task plans; do not create a parallel
specs/directory or a second current requirement pointer. - Distinguish requirement lifecycle, priority, roadmap phase, iteration commitment, and actual release status.
- Establish stable IDs for requirements that have entered decision and implementation, along with associations between PRD, Task, implementation, testing, acceptance, and release evidence.
- Temporary inserts, deferrals, rejections, cancellations, and scope changes must update the corresponding product facts and impacts.
- At closure, separately verify implementation evidence, product acceptance, and release facts; do not conflate
implemented,accepted, andreleased. - Routine requirement consistency checks are performed by this Skill itself, verifying alignment among requirements, PRD, acceptance criteria, iterations, and Tasks; only when an independent conclusion is explicitly requested, there is cross-domain contention, or entering G3-G4 formal review, hand over to Assurance.
Consult Requirement and Product Iteration Management Specification to handle the requirements backlog, roadmap, iterations, and handover.
Collaboration and Handover
- When requirements are ready for implementation, hand over to
senmu-build-engineeringwith requirement ID, goal, scope/non-goals, business rules, constraints, acceptance criteria, and open issues; technical route and implementation are Engineering's responsibility. - When product acceptance is complete and a version or real release needs to be formed, hand over to
senmu-build-deliverywith requirement/release scope, acceptance status, and evidence links; versioning, deployment, and production facts are Delivery's responsibility. - When conflicts are found in the project directory, authoritative entry point, or cross-phase status, hand over to
senmu-build-projectwith conflict location, affected owners, and desired governance outcome; Project does not take over product fact content. - Raw customer, user, and market feedback still enters the requirement system through this Skill; only experience that is validated and will change subsequent execution methods is handed over to
senmu-build-learning. - Product work requiring multiple phases or cross-session execution uses the project-declared Durable Task State Owner; only when using a new BuildOS project default instance, write to
governance/tasks/TASK-<NNNN>-<slug>.md. The requirements backlog, PRD, roadmap, and iteration plans remain product fact owners. - Scripts without continuous product evolution, one-time deliveries, or POCs are not required to establish a full product system; still retain minimal scope, acceptance, or evidence goals.