Project Handoff
Produce a self-contained checkpoint that lets a new person or agent continue the existing work. A handoff records project policy and status; it does not replace project-specific instructions or grant authority to change scope, approve work, release, publish, spend, or contact others.
Establish the current source of truth
Read the current project index, controlling issue or plan, local instructions, and the most relevant decision and evidence records. Follow the project's own source-precedence rules. Use connected sources when available. Identify conflicts and access gaps rather than choosing a winner based only on recency. Label conversation-only decisions as such and preserve their stated scope.
Create a compact source map with each area, authoritative record, purpose, revision or date, and access status. Do not claim exhaustive coverage if search, pagination, or permissions limited the review.
Reconcile the checkpoint
Record exact values when available; use UNKNOWN with a reason when a fact is inaccessible, conflicting, or unverified, and NOT_RUN for a check that was not executed.
- Workspaces: repository or document location, branch or revision, current and accepted versions, tested version, changes not saved or shared, and source verification.
- Environments and deliverables: version, build or release identifier, observation time, and deployment or delivery evidence. A merge or successful build does not prove release.
- Checks: command or review performed, result, version, environment, evidence, skips, and known limits. Keep separate runs and historical results distinct.
- Decisions and controls: decision, source and date, scope, conditions, and separate preparation, implementation, acceptance, and release states.
- Blockers: concrete cause, affected outcome, evidence, dependency, owner when known, and resolution needed.
- Local-only material: known location, unique work, save or recovery status, and access limits. Mark an inaccessible workspace
UNKNOWN; do not infer that it contains no unique work.
Preserve project-specific values and vocabulary. Do not convert an unresolved hold into approval, infer a release from a technical check, or reopen accepted decisions without new direction.
Update and save records
When the request includes documentation closeout, update the existing authoritative records before writing the final handoff. Follow the project's normal save workflow and permission rules. Avoid competing sources of truth and unrelated edits. Keep historical evidence intact; explain unresolved contradictions. Review the changes for scope and accidental disclosure, then read back saved content when the source permits it.
Distinguish local edits, saved changes, and changes verified by readback. If the update is blocked, identify unsaved work and the exact blocker; do not describe closeout as complete. For version-controlled documentation, report the final full revision identifier in the delivered handoff or a subsequent receipt, not inside the change whose identifier it is.
Deliver an actionable handoff
Use references/handoff-template.md as a flexible outline. Include only relevant sections. Put next actions in dependency order: available authorized work first, then blocked work with its missing input or decision. State acceptance evidence and stop conditions for the immediate next action. Include a clear read-first order and instruction to continue the existing work, preserving decisions and gates.
Before finishing, confirm that material state claims have a source or an explicit uncertainty; current, accepted, tested, and released revisions are distinct; decisions, blockers, local-only work, and access gaps are visible; and the next person can act without the old conversation. Keep the final summary concise and link to the detailed handoff and save receipt.