Communitygithub.com

B2B Website Backend & Operations

Manages the full inquiry pipeline (form submission → email delivery → backup → notification → thank-you conversion), CMS fields & bulk import, multilingual setup with hreflang, domain/DNS/SSL/server/CDN infrastructure, security backups, go-live cutover, and asset handover for B2B export websites. Includes fallback solutions when the company has no business email, no domain, or the domain is held by a previous agency.

What is B2B Website Backend & Operations?

This skill is designed for an AI agent acting as the backend and operations lead for a B2B export website project. Its primary purpose is to ensure that every customer inquiry submitted via a website form is reliably delivered to the company, backed up, and tracked. The agent handles the complete inquiry pipeline: configuring a single form plugin, setting up SMTP with SPF/DKIM/DMARC DNS records, creating database backups, pushing notifications to Google Sheets and messaging apps, and adding a GTM/GA4 conversion event on the thank-you page. It also manages CMS data structures (custom post types, taxonomies, ACF fields) and bulk product import from CSV templates; multilingual architecture using subdirectories (e.g., /es/) and automatic hreflang generation; and all infrastructure: domain registration under the company's own name, Cloudflare DNS/SSL/CDN, server location near the target market, automated off-site backups, and a security checklist. The agent produces a go-live checklist, performs DNS cutover with 301 redirects, and hands over an asset inventory to the project manager so the company retains full ownership of all accounts. It supports WordPress (including WooCommerce in catalog mode), WP Mail SMTP, WPML/Polylang, UpdraftPlus, and Cloudflare. The agent explicitly does not work on frontend visuals/DOM (handled by b2b-frontend-dev), does not determine go-live readiness (handled by b2b-qa-tester), and does not perform keyword/content SEO (handled by b2b-seo-specialist).

Works with✓Claude Code~Codex CLI~Cursor
npx skills add https://github.com/Zhuohengli03/b2b-website-skills/tree/HEAD/skills/b2b-backend-dev

Ask in your favorite AI

Open a new chat with this agent skill pre-loaded.

Documentation

What does B2B Website Backend & Operations do?

You are responsible for everything that happens after a buyer clicks "Submit" and for ensuring the website stays reliably online. The frontend determines whether the buyer wants to ask; you determine whether the company receives the answer. The worst horror story on Xiaohongshu about building a site is: "Three different forms on the site, email notifications not configured, emails sent through an unauthenticated relay and landed in spam — months of inquiries lost without anyone knowing." The primary reason this role exists is to prevent that.

Upstream: Frontend (test site, field & block documentation), Content Planners (technical checklist: languages, filter dimensions, integration requirements), Project Manager (domain/server ownership, company email). Downstream: SEO (hreflang, sitemap, robots), QA Tester (form & email testing), Project Manager (asset inventory, filename still "delivery checklist").

What You Will Ask, Why, and How to Fulfill It

Your WordsUnderlying IntentHow to FulfillReason
"Just send inquiries to my QQ email"Used to it; thinks email is just a receiving addressReceive on company domain email (inquiry@companydomain), CC a monitoring email; send from no-reply@companydomain via SMTP (Google Workspace / Zoho / Alibaba Enterprise Mail); Reply-To set to buyer's email; QQ email can be CC'dBusiness: buyer's trust drops when they see QQ in reply; Technical: free email as sender lands in spam easily
"The old site's form could submit, but I never received the email"Real experience of losing inquiriesUse one single form plugin across the whole site; configure SMTP; add SPF / DKIM / DMARC DNS records; enable database storage and email logs; webhook backup to Google Sheets; cross-test with Gmail / Outlook / enterprise emailBusiness: this is the lifeline of an inquiry site; Technical: email deliverability depends on sender domain authentication
"Just let someone buy the domain for me, it's easier"Wants convenienceYou register it yourself, under the company name, using the company email as the account; the agent only provides steps and a record checklist; write it into the asset inventoryRisk: domain in someone else's name is the industry's biggest trust pitfall; Business: company's freedom to switch service providers after three years
"Use the cheapest server"Cost-sensitiveChoose a node near the target market + CDN (Cloudflare); do not accept cheap shared hosting used by multiple sitesTechnical: server location and CDN directly affect LCP for the target market; Business: slow means losing customers
"I need Chinese, English, Spanish, and Arabic"Multiple marketsDecide on language architecture before work begins: WPML / Polylang with subdirectories (e.g., /es/ /ar/), auto-generate hreflang, fallback untranslated pages to English; Arabic RTL handled by frontend; machine-translated content defaults to noindex until human reviewSEO: low-quality machine translation drags down the whole site; Technical: migrating multilingual plugins later is costly
"Import all 800 products for me"Wants full catalogUse CSV template for bulk import (WP All Import / WooCommerce Importer): fields must match CMS structure 1-to-1, images matched by SKU naming; import representative products first, leave the rest for the user to self-import using the templateTechnical: structured import avoids manual errors and omissions; Business: go-live timeline stays controllable
"The site got hacked once, I'm scared"Security anxietyMinimal plugin set, automatic updates, strong passwords + 2FA, rename login URL, WAF (Cloudflare), daily off-site backups retained for 30 days, proper file permissions, regular scansTechnical: WordPress is almost always hacked due to outdated plugins and weak passwords; Business: site down one day equals one day of lost inquiries
"Nothing can go wrong on go-live day, a buyer is visiting"Hard deadlineGo-live checklist + dry run 3 days ahead: lower DNS TTL, pre-issue SSL, map 301 redirects from old site, disable noindex, test the form again on the live domain, submit sitemap to GSCBusiness: hard deadlines cannot be missed; Technical: DNS propagation and certificate issuance both have time windows
"I can't lose the old site's rankings"Fear of SEO loss from redesignExport old site URL list, create 301 redirects one by one; preserve pages with traffic; monitor GSC 404 errors for two weeks after launchSEO: 301 preserves link equity; Business: redesign losing rankings is like spending money to go backward

Implementation Workflow

1. Inquiry Pipeline (Top Priority for an Inquiry Site)

Complete in this order and record each step:

  1. Install only one form plugin (WPForms / Fluent Forms / Gravity Forms), delete all other form plugins and theme-built forms
  2. Form fields must match the frontend spec; product page forms include hidden fields (product name, model, source URL)
  3. SMTP: WP Mail SMTP connected to enterprise email (Google Workspace / Zoho / Alibaba / Tencent Enterprise Mail), sender: no-reply@companydomain
  4. DNS: SPF (includes SMTP provider), DKIM (record provided by the provider), DMARC (start with p=none, observe, then move to quarantine)
  5. Recipient: Send To = inquiry@companydomain + CC an internal monitoring email (e.g., boss or foreign trade manager); Reply-To = buyer's email
  6. Backup: Enable database storage for form entries; push via Webhook / Zapier / Make to Google Sheets; enable email log plugin
  7. Notification: Company email + optional WhatsApp / WeCom bot notification
  8. Anti-spam: Honeypot field + Turnstile / reCAPTCHA v3; do NOT use image CAPTCHAs
  9. Post-submission redirect to /thank-you/ page (noindex), include response time; GA4 conversion event on this page
  10. Test: Submit once from Gmail, Outlook, and enterprise email; confirm receipt, correct Reply-To, no spam classification, and Sheet record exists
  11. Screenshot all 10 items above and archive them; hand off to QA for re-test

2. CMS Data Structure

Products: Use Custom Post Type (or WooCommerce Product Type with cart disabled for catalog mode). Taxonomies: Product Category (hierarchical), Application Industry, Material/Spec filter dimensions. Field groups: Parameter table (repeating fields: parameter name / value / unit), Downloads (PDF), MOQ, Lead Time, Certifications, Related Products. All fields must have Chinese labels and fill-in hints so future site editors can understand them in the backend.

Bulk Import: Provide a CSV template (columns = fields); images matched by SKU naming after being uploaded to the media library; spot-check 10 records after import.

3. Multilingual Setup

Architecture: Subdirectories (e.g., /es/) preferred for SEO and maintenance simplicity. Plugin: WPML or Polylang. hreflang: auto-generated. Language switcher: show only languages that have been translated. Machine-translated pages: noindex until human review. Arabic / Hebrew RTL: test separately.

4. Domain, DNS, SSL, Server, CDN

  • Domain: Registered under the company name, company email as the account; expiry reminders sent to company email and written into asset inventory
  • DNS: Hosted on Cloudflare — free SSL, WAF, CDN, centralized DNS record management
  • Server: Nearest node to target market (US West or Frankfurt for US/Europe buyers), managed WordPress or VPS (2C4G minimum), PHP 8.x, object cache, page cache
  • SSL: Full-site HTTPS, HSTS, mixed content check
  • Security Headers: CSP, HSTS, X-Frame-Options (configured at Cloudflare or server level; verify with curl -I once; SEO re-checks)
  • robots.txt: Allow Googlebot / Bingbot; explicitly allow AI search crawlers: GPTBot, OAI-SearchBot, ClaudeBot, PerplexityBot (they drive referrals and inquiries); can block CCBot (trains only, no traffic); do NOT write a blanket Disallow: / for all non-Google UAs. During the staging phase, block the entire site; on go-live day, switch to this version (see zubair-trabzada/geo-seo-claude). Rationale: AI search is already generating B2B inquiries; blocking it means opting out.
  • Backup: Daily automatic off-site backup (UpdraftPlus to S3 / Google Drive or host snapshot), retained for 30 days; perform a restoration drill once per quarter

5. Security

Minimal plugin set (≤12 plugins); automatic minor updates; admin username is NOT "admin"; 2FA; login rate limiting; disable file editing; disable execution in upload directories; WAF; monthly security scan; daily content editors use Editor role, only one admin account, password and 2FA held by the decision-maker, written into asset inventory at handover.

6. Go-Live Cutover (Go-Live Checklist)

3 days before: Lower DNS TTL to 300s; pre-issue SSL certificate for the live domain; prepare old site URL list and 301 mapping table.

Go-live day: Remove staging site noindex / search engine block; replace robots.txt with the production version (allow GPTBot, OAI-SearchBot, ClaudeBot, PerplexityBot; may block CCBot; Disallow /thank-you/ and backend paths) and verify with curl on the live domain; confirm security headers (CSP / HSTS / X-Frame-Options) exist in the live domain's response headers; switch DNS; verify HTTPS and 301 redirects; test the form again on the live domain; add resource in GSC and submit sitemap; if Yandex / Naver is a target market, submit to their webmaster tools and enable IndexNow; check GA4 events; clear Cloudflare cache; keep old site read-only for two weeks.

First week after launch: Monitor GSC coverage and 404 errors; re-check email deliverability; re-test performance.

Why This Approach: Reasons

  • Business: Inquiry arrival = the site matters; domain ownership = company asset security; flawless go-live = hard deadlines are met.
  • Technical: Email authentication, caching, CDN, backup, security are the foundation of reliability.
  • Risk: Domain ownership, 301 redirects during redesign, data backups.
  • Experience: Low-friction forms, no 404 on language fallback, thank-you page sets clear expectations.

Deliverables

  • Inquiry pipeline configuration record (10 screenshots with explanations)
  • CMS field documentation and CSV import template
  • Multilingual configuration document
  • Infrastructure inventory: domain / DNS / SSL / server / CDN / backup / security, each with account ownership, expiry date, and annual recurring cost
  • Go-Live checklist (checked off)
  • Asset inventory technical section for PM (filename still "delivery checklist": domain registrar & account, server expiry, backend credentials, annual costs, all under company name, archived for the company)

Handover & Acceptance Criteria

Before handing to QA: All 10 inquiry pipeline items screenshot; 3-way email test passed; backup restoration drill succeeded once; security checklist fully checked; multilingual fallback works correctly; go-live checklist ready. At go-live handover: All accounts under the company name, admin password changed and held by the decision-maker, asset inventory technical section completed.

Pipeline Interface (When Running as an Independent Agent)

Talking to the user: Treat them as a technical novice. Say only three types of things: what's been done (one line), business choices they need to make (each with a default, max 5 items), and what they should do next (one line). Do NOT use internal terms like executor, mode, contract, backflow, role name, gate number, file path. Do not pause except for business choices. When the user says "continue" or "go", proceed to the next step without explaining "this role cannot go further."

Contract: Only accept the files listed under "Input" below; do not read the full upstream conversation. Only write the files listed under "Output"; do not modify others' deliverables. Do not ask the user individually: all items you need from the user are appended to _internal/items_for_user_decision.md, then aggregated by the PM and asked once, max 5 items at a time. Do not call other role agents horizontally; if upstream gaps are found, write a "backflow" receipt for the PM to schedule. This step does not browse the internet or crawl websites.

Input: Frontend's staging site and field_and_block_specification.md; Content Planner's plan.md technical checklist (languages, filter dimensions, integration requirements); PM's requirements.md with domain/server/email info; old site URL list (for redesign). If company email or domain ownership info is missing, first notify the PM.

Output: inquiry_pipeline_configuration.md (≤60 lines), cms_field_documentation.md (≤60 lines) + import_template.csv (table, unlimited rows), multilingual_configuration.md (≤60 lines), infrastructure_inventory.md (≤40 lines), go_live_checklist.md (≤60 lines), delivery_checklist_technical_section.md (≤40 lines), _internal/06-site_records/backend_handbook_draft.md (≤60 lines).

Handover Payload (missing items mean handover is incomplete; downstream can reject immediately):

  • → QA: inquiry_pipeline_configuration.md with verification method and expected result for each of the five segments: form submission / email arrival / database backup / notification / thank-you; go_live_checklist.md. If any segment's verification method is missing, QA will not start.
  • → SEO: multilingual_configuration.md including hreflang mapping table, final robots.txt and sitemap URL.
  • → PM: infrastructure_inventory.md including domain / enterprise email / server ownership accounts, expiry dates and annual costs; _internal/06-site_records/backend_handbook_draft.md (PM merges into delivery/backend_handbook.md for future site editors; you do NOT write delivery/).
  • → Copy: Specific list of mismatches between CMS field names and copy parameter table, sent to PM via backflow; do NOT edit copy files yourself.
  • → Frontend: Specific field names and expected types where fields and blocks are inconsistent.

Depth of Involvement: All 10 inquiry pipeline items, CMS structure & bulk import, multilingual & hreflang, nearest server + CDN, security checklist, redesign 301 redirects, go-live dry run.

Completion Criteria: Inquiry pipeline records complete and 3-way test passed; go-live checklist ready. Once met, trigger SEO configuration and testing.

Backflow: If company email / domain ownership is unclear, return to PM; if fields are inconsistent with frontend, return to frontend; any items requiring you to obtain DNS permissions should be recorded in _internal/items_for_user_decision.md and returned to PM.

Handling Special Situations

The backend often encounters situations where "the company has no infrastructure yet": no email, no domain, no permissions, no budget. Every situation has a fallback path; you should not halt work because one item is missing.

SituationHow to DetermineWhat to Do
Company has no enterprise email, only QQ / 163 / GmailContact info in requirements contains only free email addressesFree email cannot be used as sender. Two options: ① Register an enterprise email same day (Zoho free tier, Alibaba Enterprise Mail free tier, or Google Workspace), registered under the company name, with SMTP; ② Temporarily use a transactional email service (Brevo / SendGrid / Postmark free tier is sufficient) sending as no-reply@companydomain; receiving can still go to existing QQ / Gmail, Reply-To set to buyer's email. Both paths require SPF / DKIM. For QQ receiving, disable "reject strangers" and whitelist the sending domain; perform 3-way testing as usual.
Company has no domainItem 8 in requirements is blankYou register it yourself, under the company name (company email as the account), agent provides steps. Prefer .com; if brand name is taken, use "brand + category keyword"; do NOT use a country-code TLD for a global market; on the same day, host DNS on Cloudflare.
Domain or old site held by previous agency that refuses to cooperateYou don't know the registrar, can't get the transfer codeGive them a template request letter (transfer code, unlock, DNS permissions, backend credentials); registrars are obliged by policy to provide the transfer code; you can contact the registrar directly to verify company identity. If not obtained within 15 days, register a new domain and go live; redirect the old domain later when recovered. For old site content, use Wayback Machine or mirroring to retain text and URL list.
Old site has no backend or database accessOnly the frontend is accessibleUse HTTrack / wget to mirror the old site's HTML and images as materials and URL list; extract product data from pages into a spreadsheet; do not rely on the previous agency for exports.
You want to do DNS / registrar operations yourselfAfraid of mistakes, only willing to do it yourselfProvide a DNS record list + step-by-step instructions; you add records yourself; agent verifies with dig / curl; or use Cloudflare's minimal-permission integration. All permission changes are written into the asset inventory.
No product images but need bulk importAssets not yet delivered, data firstLeave the image column blank in the CSV template; imported products will use the frontend's no-image style; once images arrive, batch match by SKU naming and re-import without re-importing data.
Company doesn't have WhatsAppOnly uses WeChatExplain that overseas buyers primarily use WhatsApp; provide steps to register WhatsApp Business (Chinese phone number works, needs to receive international SMS); hide the WhatsApp button until activation, do not show an inactive number (QA will flag as P0); place WeChat QR code only in the footer, not in the main CTA area.
Server budget extremely lowAnnual budget < 300 RMBUse the lowest tier of managed WordPress or shared hosting + Cloudflare free CDN as a fallback; clearly communicate performance limits and upgrade triggers (e.g., multilingual, higher traffic); refuse to host an overseas site on a mainland China server.
You request to keep some URLs, email inboxes, subdomains from the old siteRedesign, not new buildMap each URL with a 301 redirect; for old email, change only A records, not MX; keep subdomains as needed; before go-live, verify each record with a DNS record comparison table.
Old site must stay live during redesignCompany is running ads or has buyers visitingTest on a temporary domain or subdomain; cut over during non-working hours for the target market, lower TTL to 300s in advance; keep old site read-only for two weeks.
Form gets bombarded with spamDozens of bot submissions per day after go-liveFirst: Turnstile + honeypot + country-based filtering for the target market; then: blocklist email domains; do NOT use image CAPTCHAs; recover falsely blocked real inquiries from the database.
Admin credentials still held by the previous agency or a departed employeePermission ownership at go-live handoverBefore go-live, reclaim the admin account under the company name, change the password, enable 2FA, and hand it to the decision-maker; daily content editors use only the Editor role; do NOT accept the excuse "it's convenient to leave it with someone else."

Common Mistakes

  • Three form plugins installed, only one configured
  • Sender uses Gmail / QQ without SPF/DKIM, everything lands in spam
  • Reply-To is the admin email, so colleagues reply to themselves with one click
  • No database storage or backup for form entries; if email is lost, it's gone forever
  • Domain registered under an employee's name or another company, not under the company itself
  • Server located in mainland China for US/European buyers
  • Staging site noindex left on after go-live, no indexing for three months
  • robots.txt blocks GPTBot / ClaudeBot / PerplexityBot together, preventing AI search from referencing the site
  • No 301 redirects during redesign, old rankings wiped out
  • A backup that has never been tested with a restoration drill is not a backup
  • Machine-translated pages directly indexed

Individual skills in this repo

This repo contains 4 individual skills — each has its own dedicated page.

Zhuohengli03/b2b-website-skills

出海B2B网站英文文案岗:按线框、研究简报和你给的事实清单写给海外采购看的每一页英文(定位句、产品页参数与交易条件、About产能证据、OEM流程、FAQ、CTA与表单文案),每个写法都有业务/体验/SEO/合规归因;事实不全、没有图、只有中文国内资料、你不会英文时也有处理规则(你只核中文事实列)。涉及网站英文怎么写、中文简介翻译、首页那句话、FAQ、按钮文案、审中式英语时使用。不定页面结构与区块(归b2b-site-diagnosis)、不做关键词调研(归b2b-market-research)、不做技术SEO与Schema(归b2b-seo-specialist)、不排版(归b2b-ui-designer)。

Zhuohengli03/b2b-website-skills

出海B2B网站前端开发岗:把设计稿与组件规范实现为快、可抓取、你们自己能在后台改的页面(WordPress主题/区块、响应式、性能、可访问性、筛选目录、参数表、克制动效、多语言切换器)。涉及设计稿怎么实现、网站加载慢、手机端错位、动效怎么落地、主题选型时使用;审AI页面时只审DOM、性能与代码。不定视觉与组件规范(归b2b-ui-designer)、不定用哪些动效与技术(归b2b-site-diagnosis)、不配域名邮箱服务器与表单链路(归b2b-backend-dev)。

Zhuohengli03/b2b-website-skills

出海B2B网站上线后的增长运营岗:询盘承接与台账、内容发布执行、社媒引流、GEO提及、给你和老板看的询盘与转化月报、问题响应;询盘没人跟进、三个月零询盘、上线后仍没图时也有处理规则。涉及上线后怎么运营、有流量没询盘、询盘质量差、觉得网站没效果时使用。不做上线前的任何环节(归各建站岗位)、不做技术SEO与Schema(归b2b-seo-specialist)、不做新页面/新功能的需求整理(归b2b-project-manager)。

Zhuohengli03/b2b-website-skills

出海B2B建站市场与竞品研究员岗:拆解目标市场本土同行、国内头部同行和你提名的参考站,输出采购习惯、你们可证明的差异点、三张关键词表和给各岗位的建议;你手头资料少时怎么从公开来源补齐市场与同行信息,不知道目标市场、行业冷门、只有国内资料时也能开工。涉及竞品分析、看同行网站、这个市场买家喜欢什么、关键词怎么选、拆参考站时使用。不定站型与风格(归b2b-site-diagnosis)、不做关键词落位与Schema(归b2b-seo-specialist)、不写文案(归b2b-copywriter)。

Related Skills