Was macht plan-it?
Take a fuzzy demand → ship a buildable delivery package. This is the planning
conductor: the disciplined front-half of the lifecycle that ends exactly where
/fable-it begins. It does discovery (research the ground truth), spec
(author the design docs), and agile split (PRDs, epics, tests, the shared
contract) — then hands off.
/plan-it ─────────────► docs/ + delivery/ ─────────────► /fable-it
(discovery → spec → plan) (the buildable package) (builds it)
Usable by a human directly, and by any orchestrating conductor agent that receives a new demand and must turn it into a delivery package before dispatching workers.
The five non-negotiable rules (enforce these — don't just suggest them)
These are the load-bearing rules reverse-engineered from every successful run. If you violate one, the build downstream drifts or silently fails.
-
Freeze a shared CONTRACT before any parallel planning. The CONTRACT is the law: canonical entities, schema, API/interface, enums, repo/branch map, and the definition of "shipped." Squads write to it; any cross-cutting discovery folds back into it as a dated amendment (v1.0 → v1.1 …). No frozen contract → no parallel squads.
-
Batch every human-only decision into ONE gate. Do not pre-decide anything irreversible (repo topology, hosting, product name, architectural mode, build-vs-buy). Surface them together, each with a recommendation attached, and let the human answer numbered. This gate is where the human injects vision, not just picks options — leave room for them to add a concept you didn't propose. Lock each answer with owner + date.
-
Verify every agent's output on disk — "idle ≠ delivered." A team going idle does NOT mean it wrote files. After any fan-out, check the actual paths exist and are non-empty before proceeding. If a team held its output as a message, direct it to
Writeto the exact absolute path. Never trust a "done." -
Ground the plan against the LIVE system, not the repo — before you freeze. For any plan touching a running system, the repo is a hypothesis; the deployed reality is the truth, and they drift. Before freezing the CONTRACT, verify against the actual system and write the observations in (not repo-derived guesses). Battle-tested: in one program EVERY mid-flight correction traced to a repo-inferred assumption reality contradicted — wrong canonical identifiers (manifests had drifted from the deployed catalog), a config value that was present-but-pointing-at-a-dead-host, "to-be-built" components that were already deployed, and a found credential that was the wrong one. See Phase 3's live-grounding gate for the concrete checks.
-
Run the machine, not the prose. The pipeline's control flow lives in
machine.json(the explicit statechart), not in this document — this prose explains the machine. On invocation, read or initialize.plan-it/state.json(in the target project) and resume from itsstate; write it on every transition. At every guarded transition, run the guard's mapped subcommand (node scripts/gate-check.mjs <check> …) and never advance on a non-zero exit — fix, re-run, then transition. If Node is unavailable, perform the same checks manually and record them in the state file (degrade, never break). Full protocol:references/machine.md.
The deterministic core (v2) — why a machine
Control flow written as prose ("do step 1, never skip the gate") is what the determinism literature calls prose control flow: it relies on the model's discipline across a long, summarization-prone context, and sometimes the model won't follow it. v2 inverts that at the right altitude — non-determinism at the edges, determinism at the core:
machine.json— XState v5-compatible statechart of the pipeline: 15 states, the three human gates (meta.gate+meta.human), guarded transitions, and anAMENDMENTself-loop onparallelPlanning. Paste into stately.ai/viz to see it..plan-it/state.json— the persisted run: current state, gate approvals (owner + date), contract version, verified-artifact registry, history. This is what makes a run survive a crash or a fresh session.scripts/gate-check.mjs— the guards as exit codes:verify(Rule 3, idle ≠ delivered),freeze(Rule 1, no contract → no squads),handoff(the mechanizable half of playbooks §F),state(Rule 2, gates recorded),adversary(Rule 6 / D4 — failure-mode depth: a modelled machine must cover-or- waive the five cascade classes; N/A for linear workflows). TheLINT_CLEANandADVERSARY_CLEANtransitions (verify → adversaryGate → handoff) gate on the last two.
The fuzzy phases — discovery, synthesis, spec authoring, judgment — stay
LLM-at-the-node (tagged llmAtTheNode in the machine). Do not formalize them;
modeling is not ceremony only when it replaces confusion. Details, state-file
schema, and the resume protocol: references/machine.md.
Hard enforcement (v2.1, plugin installs on Claude Code only): a PreToolUse
hook (scripts/hooks/planit-guard.mjs) denies Write/Edit calls on PRD/epic
deliverables while the run's contract is unfrozen — Rule 1 stops being an
instruction and becomes something the harness refuses. Fail-open: it never
touches non-plan-it work. Skill-only installs rely on Rule 5 discipline instead.
The Test Contract — the quality differentiator (make this non-negotiable)
The single thing that most raises delivered code quality: every PRD/epic ends by
generating its own test contract — up to ~20 concrete use-cases/scenarios that
stress the implementation — and the feature is NOT "done" until 100% of them pass.
The build agent cannot just deliver the feature; it must satisfy the contract, and
/iterate until green.
This is a named, proven discipline: Specification by Example (Gojko Adzic) + ATDD/BDD for code (concrete examples become executable acceptance tests and living documentation), and Eval-Driven Development for skills/LLM features (register goldens with expected outputs, iterate until they pass). Authoring the cases at planning time is the whole point — they become a binding contract, not an afterthought.
Rules of the Test Contract:
- Authored at planning time — the LAST step of writing each epic/PRD is its test contract. Expected outputs are registered now ("designed first; expected outputs registered"), not discovered mid-build.
- Up to ~20 high-quality cases per feature — enough to stress real behavior + edges; not thousands of shallow ones (quality > quantity — auto-bulk = "slop", per the eval literature). Draw cases from real/likely failure modes. Per-shape count rule: large Shape-1 multi-squad programs hold a ≥10 cases-per-epic floor (each epic is a big feature); small shapes (single skill/feature, S/M) author ~20 cases total across the package (a handful per epic). Never both at once — pick by shape so a reviewer doesn't flag a correct small package as under-tested.
- Binding — DoD = 100% of the contract passes; until then,
/iterate. No partial ship; no VERIFIED-on-a-mock (a[REAL]case whose target is unreachable → IMPLEMENTED-NOT-VERIFIED, never a fake green). - Pick the test types by implementation (one or more of unit / e2e / use-cases / stress):
| Implementation | Test types | How |
|---|---|---|
| CRUD / REST API | use-cases (happy+edge) + e2e | run every scenario via API and via UI with Chrome CDP (chrome-cdp-control); unit-test the logic |
| Skill / prompt / LLM function | use-cases w/ expected output | run it, compare real vs expected — exact match for closed outputs, rubric / LLM-as-judge for open ones (make-eval, promptfoo, DeepEval G-Eval) |
| Agent / stateful / multi-step | stress scenarios + use-cases | six axes: async, fan-out, escalation, human-gate, recursion, cycle-guard (Setup/Expected/Pass) |
| Pure logic / library | unit + property-based | enumerated cases + invariants |
| Data pipeline / migration | golden-value + e2e | hand-computed expected values; idempotency/rollback |
| Anything with load/abuse surface | stress / adversarial | concurrency, rate, malformed input, red-team |
- Execution path:
/full-qaruns the contract,/iterateloops it to 100%,chrome-cdp-controldrives UI scenarios. The contract is the bridge from plan-it → fable-it:/fable-it's Definition of Done = this contract.
Grammars and the contract header format: references/formats.md (the Test Contract
block + §4–5).
Autonomy posture (guided with autonomous bursts)
Run research and authoring autonomously at high effort, but stop at three gates:
| Gate | When | What you ask |
|---|---|---|
| G1 — Scope | after intake (Phase 2) | confirm the sizing (feature vs program) + the numbered DoD before burning effort |
| G2 — Decisions | after specs drafted (Phase 7) | the batched "decisions only you can make," each with a recommendation |
| G3 — Delivery | before the agile split (Phase 8) | "specs look aligned — proceed to PRDs/epics?" |
Everything between gates runs unattended. Recommend /effort xhigh at the start
(you cannot set it yourself — tell the user to run /effort xhigh if they haven't).
Phase 0 — Intake
Machine first (Rule 5): if .plan-it/state.json exists in the target project,
run node scripts/gate-check.mjs state .plan-it/state.json and resume from the
printed state — do not restart phases already in history. If it doesn't exist,
create it now in state intake (schema in references/machine.md) and keep it
updated on every transition for the rest of the run.
Accept the demand in whatever form it arrives: a brain-dump, a pasted
transcription, a list of wants, or a one-liner. Expect pointers, not content —
session names (/read-chat "<name>"), repo paths, doc folders. Your job is to go
fetch the ground truth, not to be handed it.
Capture up front:
- The raw vision in the user's own words (you'll quote it back in
02 §1). - Pointers to prior sessions / repos / docs to research.
- Use-case (auto-detect — this drives the packaging shape at Gate G1):
- new single app, greenfield · feature on a large existing repo · from-scratch multi-subsystem program · multi-app platform (many PRDs) · refactor / migration / debt · research spike (no build yet) · PM/board automation · document/audit an already-built system.
- Research method: default to parallel Claude teams at xhigh.
If the demand is genuinely one fuzzy paragraph with no pointers and an existing repo, that's fine — pre-grounding (Phase 3) will find the targets.
Phase 1 — DoD lock
Restructure the fuzzy prose into a numbered, individually-verifiable Definition of Done + a short list of stated assumptions. This is your contract with the user for the planning job itself. Example shape:
DoD for this planning run:
1. Ground-truth findings doc (every claim → path:line or table)
2. Vision + architecture doc that solves each finding/contradiction
3. Data/interface contract
4. … (auto-sized — see Phase 2)
N. Handoff: contract frozen, PRDs+epics with ≥10 tests each, kickoff prompt
Assumptions: <list>
Phase 2 — Scope & shape governor ⏸ GATE G1
Pick size (how much) and shape (what form) before spending effort. Confirm both with the user.
Size scales the artifact count:
| Signal | Size |
|---|---|
| Single feature, 1 subsystem | S |
| Multi-feature / new subsystem, 1–2 repos | M |
| From-scratch program / many subsystems | L |
Shape is chosen by use-case (full definitions + the use-case→shape table in
references/templates.md PART D):
- Multi-doc +
delivery/(baseline) — from-scratch program, parallel squads. - Single-file PRD-as-everything — greenfield single app; CONTRACT inlined as G-rules.
- Research → locked-architecture → master+phase PRDs — feature on a large existing repo.
implementation/<name>/with numbered PRD-NN — multi-app platform, many PRDs.- Refactor/debt workstream catalog — brownfield in-place. (+ research-spike, executable-board, and reverse-doc modes — see PART D.)
Same phases regardless — only the artifact count and form change. Don't give a
feature a 4-squad org; don't give a brownfield refactor a greenfield vision doc.
Present the chosen size + shape + the numbered DoD and get a yes before proceeding.
On yes, record G1 = {approved, owner, date} plus the chosen size/shape in
.plan-it/state.json — the G1_APPROVED transition is guarded by gateRecorded.
Phase 3 — Pre-ground
Before any fan-out, locate exact targets so agents get precise paths, not vague instructions:
- Resolve pointer sessions with a session-reading skill (
/read-chator similar) if one is installed; otherwise ask for the relevant transcript or summary. ls/grepthe named repos; find thedocs/, schema files, entry points.- Read the wiki hot-cache/index if the repo is vault-wired (per its
CLAUDE.md).
Output: a list of {subsystem → exact paths to read} that seeds the research teams.
Live-grounding gate (rule 4) — when the plan touches a RUNNING system
The repo tells you what should be true; the live system tells you what is. Do this before Phase 8 freeze, and write the findings into the CONTRACT as observed facts:
- Config reachability, not presence. For every env/config lever the plan depends on (base URLs, API hosts, feature flags), hit it — don't just confirm it's set. A value can be set to a dead host and pass a "does it exist" check while silently breaking prod.
- Live registry / canonical identifiers. Dump the actual slugs / IDs / enum values the running system uses (integration slugs, catalog rows, schema). Repo manifests drift from the deployed catalog — bind the CONTRACT's canon to the LIVE value, not the manifest.
- Deployed vs installed vs in-use. Inventory what's already running, what's registered, and what's actually used by a tenant/user. "Build & deploy X" is often "redeploy X," and a component that's deployed-but-uninstalled cannot be live-verified per-item — which changes both verification depth and priority. Tag each target.
- Credential validity, not existence. A found key/token ≠ a correct one. If a plan relies on a credential, verify it actually works (a live call), and confirm ownership — a leftover token from another account will pass structural checks and fail at runtime.
- Derive dependency sets from ACTUAL usage, cross-checked live. Build the integration/
dependency list from
code-grep ∪ every component's declared requirements, intersected with the live registry — then list the gaps as explicit work. A list derived from a subset or from repo manifests will miss things the running system actually needs. - Separate "our code change" from "external connection/config/data seeding." The code change is usually the easy, ownable part; the real blocker is often an external OAuth connection, a seeded secret VALUE, or an ops action — and it belongs on the critical path with an owner, not buried as a footnote.
Two build-time corollaries worth encoding in the CONTRACT/epics so the builder inherits them: map a caller/consumer surface before planning any auth-guard or interface change (a guard that breaks N callers is worse than no guard); and any repo import must be a full-tree secret-scan + runtime-only subset, never a history mirror.
Phase 4 — Discovery (autonomous burst)
Pick a discovery mode by use-case (full playbook in references/playbooks.md §A):
- Solo read — small feature, one subsystem.
- Parallel research streams — research-heavy: N agents, one concern each, each
writes a cited
research/stream-<X>.md. - Team-of-N codebase slices — large codebase: N agents, one non-overlapping slice each, with explicit teammate-boundary notes.
- Verify-then-extend — brownfield/refactor: confirm every claimed gap against live code with file:line before it enters the spec, then sweep for new issues (see playbooks §B).
Shared mechanics for any fan-out:
- Pre-ground first — find the chokepoint/exact paths so agents don't work blind.
- Shared-context contract — write
research/SHARED-CONTEXT.md, the one file every agent reads before working (Guardrail 1 for research). - Fixed report skeleton + skeptic posture ("be criterious, cite path:line").
- Stage findings to disk immediately (
_research/NN-<slice>.md) so nothing is lost to summarization. - Tell each agent: "you MUST run the tools and return findings; do not stop early."
- Apply Rule 3 — pull idle teammates. After fan-out, run
node scripts/gate-check.mjs verify <every expected output path>— theFANOUT_COMPLETEtransition is guarded by it. On failure,SendMessageany silent agent to deliver; re-dispatch any team that did 0 work (this happens — caught and recovered live during the skill's own build-out). Record each passing artifact in.plan-it/state.json→artifacts. - Adversarial reconciliation — when agents contradict, adjudicate in synthesis; don't average.
- Independently verify the centerpiece yourself rather than trust the team blind.
Use the Agent tool (Explore/general-purpose), or /fable-it's team machinery
for larger runs. Keep all synthesis single-threaded in the main thread.
Phase 5 — Synthesis + memory
Merge the team reports into docs/01-current-state-and-findings.md (every claim
traceable to path:line or a table). Capture a project memory file so the thread
survives context loss (per the memory rules in your environment).
Phase 6 — Spec authoring (autonomous burst)
Author the design docs in dependency order (skeletons in
references/templates.md). For size L the canonical arc:
01Current state & findings — diagnosis (contradictions/tensions, evidence)02Vision & architecture — principles that solve each contradiction + the shape03Data model & contract — canonical entities, schema, interface, migration04[domain] organization — the durable/human layer (if there is one) (optional)05[components] — deep-dive each major component: verdict, keep/discard/build, cost07[organizing pattern] — the composability metaphor + "add a node" playbook (optional)06Roadmap & open questions — phased plan, first vertical slice, risks, the decision list
Methodology to honor while authoring:
- Model the confusing parts — including the failure half — when discovery
surfaced a workflow that is multi-step, approval-gated, agentic, concurrent, or
retry/escalation-laden, the spec MUST include an explicit model of it (statechart,
state-transition table, or equivalent — a given/when/then transition list is
enough), and the epics that build it reference the model. The CONTRACT carries
these under "Core-logic models." Only the confusing parts — modeling is not
ceremony when it replaces confusion, and only then. A model is not just the
happy path: name at least one failure state and one recovery/compensation
transition out of it, or the downstream Test Contract has no depth to reach for.
gate-check adversary(D4) enforces this at theadversaryGatestate — the five cascade classes (partial-failure, rollback/compensation, failed-recovery→ escalation, recovery/resume, adversarial-verify) must each be covered-or-waived. A genuinely linear workflow declares no machine and the gate is N/A (no over-reach). - Never greenfield when code exists — every doc shows what's already built and how to promote it (mapping tables), not just what's new.
- Contradiction-driven — start from pain (01), derive principles (02), operationalize them everywhere after.
- Evidence-based — cite code, not intuition.
- Risk-honest — name rate limits, fidelity gaps, failure modes explicitly.
- User-voiced — restate the wants in the user's own language; map architecture back to each want.
Route per the repo's CLAUDE.md: code-adjacent docs → repo docs/; project
decisions/sessions → the vault.
Phase 7 — Decision round ⏸ GATE G2
Collect every genuine judgment call into a single "Decisions only you can make"
section (lives in the roadmap doc 06 §4). For each: state it, attach a
recommendation, but do not pre-decide the irreversible ones. Present them
numbered. The user answers numbered.
Then:
- Lock each answer into the docs, marked "locked," with owner + date —
and record
G2 = {approved, owner, date}in.plan-it/state.json(G2_ANSWEREDis guarded bygateRecorded). - If the user introduced a new concept (they often do here), thread it through —
add/rewrite the affected doc (e.g. a new
07) and run a coherence pass (grep for now-stale terms the new decision invalidated; fix them).
Phase 8 — Backbone freeze ⏸ GATE G3
Ask "specs are aligned — proceed to the delivery package?" On yes, write the backbone first, because squads build their PRDs against it:
delivery/CONTRACT.md(frozen v1.0) — vocabulary, schema, verbs/interface, primitive interface, enums/literals, repo ownership + branch rules, definition of "shipped," changelog.delivery/00-program-plan.md— squads, epic backlog, waves, test standard, branching, the fable-it runbook, the board pointer.delivery/STATUS.md— the live board, all epics in backlog.
(For size S/M, fold these into fewer files — a contract section + a single plan.)
Record G3 = {approved, owner, date} on the user's yes. Then, before any squad
fan-out, run node scripts/gate-check.mjs freeze delivery/CONTRACT.md (or the
file carrying the inlined contract section) — the CONTRACT_FROZEN transition is
guarded by it, and Rule 1 is now an exit code, not a plea. Record the contract
version + path in .plan-it/state.json → contract.
Phase 9 — Parallel planning (autonomous burst)
Fan out one squad team per repo lane (disjoint files — no co-editing). Each
writes its prds/prd-N-*.md + epics/epics-N-*.md against the frozen CONTRACT.
- PRD per squad: summary, problem & goals, users & jobs, solution design
(numbered decisions D1–DN, citing
file:line), epics table, acceptance criteria, risks, repo/branch plan. - Epics per squad: per epic — branch (
epic/<EID>-<slug>), deps, scope, task checklist (file:line scoped), then — as the LAST and load-bearing step — the Test Contract: up to ~20 type-selected use-cases/scenarios with expected outputs registered (see "The Test Contract" above andformats.md). DoD = 100% of the contract passes. This is the heart of the epic, not a footnote.
Amendment loop: squads grounding in real code will surface cross-cutting
integration issues before any code is written — fold each back into CONTRACT.md
centrally (v1.0 → v1.1 …) so squads can't drift. This is the contract doing its job.
Scaling the fan-out (when there are many PRDs, not 4 fixed squads): use the
parallel-batch generator (playbooks §C) — a features.json work-breakdown
(one row per PRD), subagents spawned in review-gated batches, the same
template+glossary injected into every subagent for coherence, and a
cross-PRD consistency lint after the fan-out. PRD numbering PRD-NN where NN =
dependency order.
Optional executable split (playbooks §D): instead of (or beside) epics/*.md,
emit the breakdown onto a live GitHub Projects board via a ghp.sh helper
(epic = parent issue, tasks = native sub-issues, status single-select; GitHub is
source of truth, tracker.md a cache). Offer this when the user wants a live board.
Apply Rule 3 after the fan-out — node scripts/gate-check.mjs verify prds/ epics/
(the SQUADS_COMPLETE transition is guarded by it). Each AMENDMENT bumps the
contract version in .plan-it/state.json (v1.0 → v1.1 …) and stays in
parallelPlanning — the machine's self-loop.
Phase 10 — Verify + handoff
- Enforce the Test Contract gate: every epic carries its contract (up to ~20
type-selected cases, expected outputs registered); tally the totals; flag
[REAL]cases (those needing a live target). DoD = 100% pass via/full-qa+/iterate. No[REAL]case may be marked VERIFIED on a mock — unreachable target → IMPLEMENTED-NOT-VERIFIED, never a fake green. - Run the mechanizable lint first:
node scripts/gate-check.mjs handoff delivery/— theLINT_CLEANtransition is guarded by it. It checks ID grammar, declared-vs- counted case totals,[REAL]tallies, per-epic Test Contract presence, and token lint. The judgment half below still needs you. - Then run the adversarial-depth gate:
node scripts/gate-check.mjs adversary delivery/— theADVERSARY_CLEANtransition (verify → adversaryGate → handoff) is guarded by it (D4). When the CONTRACT declares a state machine, it enforces failure-mode depth: the machine models failures + recovery, every declared failure state is an asserted case, and the five cascade classes are covered-or-waived. Linear workflows: N/A, passes. - Run the pre-handoff consistency gate (
references/playbooks.md§F) — the lint that makes a package build unattended: counts add up (count tags, don't hand-type); every goal & governance rule has a test; the CONTRACT verb/API surface reconciles with what's "kept" and what's tested; if the tool parses its own artifacts, round-trip the grammar over the generated sample; every diff/sync verb declares live-vs-cached reads; every "never X" invariant has an inverse-op test; IDs/dep-graph coherent across files; token lint. Fix and re-lint until clean. (These are the exact defect classes a dry-run shipped — don't hand off without it.) - Assemble:
delivery/README.md(index) +delivery/KICKOFF.md(orientation: one-liner, first slice, repo map, locked decisions, gotchas, handoff state). KICKOFF is generated, never copied stale: it MUST open with the "0. Pinning" block (absolute repo path @ full git SHA,.plan-it/state.jsonpath, CONTRACT SHA-256) and make "re-derive tally + reconcile from disk, stop-and-report on mismatch" the builder's first numbered step (references/templates.mdKICKOFF block, PRD §D4–D5). - Fill the board:
STATUS.mdrows reflect Wave-0 in-progress, rest backlog. - Hand off (the terminal phase — the build runs in a fresh session):
- Wire the repo to your knowledge base (
/sync-obsidianor equivalent), if your environment has one. - Capture a session debrief (
/session-debriefor equivalent) — session note, reusable patterns, memory. - Produce the launch handoff (
/next-session-prompt, or author it directly) — the KICKOFF doc and the exact copy-paste launch prompt (this is thesample-prompt-prd.txt-style artifact that/fable-itconsumes). Done.
- Wire the repo to your knowledge base (
- Optional handoff enrichments (playbooks §E): a
README.mdconsolidation hub (reading-order table + decisions-in-one-screen + GATING items); aKICKOFFS.mdarchiving the launch prompt per PRD/phase; aDELIVERY-LOG.mdtruth board; and for large PRDs, an initial slice + a later-CONCLUDErun to close deferred IMPLEMENTED-NOT-VERIFIED items.
Final report to the user: per-doc + per-epic status, total test count, the locked decisions, and the launch prompt.
Composes with
/fable-it— the build engineplan-itfeeds. The handoff prompt targets it./read-chat(optional) — resolve pointer sessions in pre-grounding./sync-obsidian,/session-debrief,/next-session-prompt(optional) — the handoff trio; degrade to inline equivalents when absent.- Agent / Claude teams — the research (Phase 4) and squad (Phase 9) fan-outs.
References (read the one you need before authoring)
references/machine.md— the deterministic core:machine.jsonexplained, the.plan-it/state.jsonschema + resume protocol,gate-checkusage, the degrade-gracefully rule, and the "model the confusing parts" output discipline. Read at Phase 0 (resume) and before every guarded transition.references/templates.md— doc + delivery skeletons (PARTS A–C) and the 5 packaging shapes + use-case→shape map (PART D). Read PART D at Gate G1 to pick the shape; read A–C before authoring.references/formats.md— the composable atomic formats (lego bricks): decision log, blocking-questions table, governance/invariant block, the 4 test-case grammars, test-tier matrix + coverage-map self-audit, typed task grammar + dep-graph DAG, the DoD ladder, the honest run-report / DELIVERY-LOG.references/playbooks.md— advanced moves: discovery modes (incl. verify-then-extend), brownfield/refactor templates (verdict tables, blast-radius, naming-first, schema-vs-data-migration), scale-out batch PRD generation, the executable GitHub-board split, and handoff enrichments.
Authored by DevOtts.